Elmfield Road Public Realm Improvements
Sector: Rail • Location: United Kingdom
Source: Open Contracting Data Standard (OCDS)
Bromley South, and specifically Elmfield Road, has been identified as a key employment site within the borough with opportunity for development and inward investment. This is supported by the Employment Land and Space Study, completed in 2024, and the Council's Growth Plan (2024-27). Elmfield Road is a 6.58-hectare site adjacent to Bromley South Station, predominantly occupied by office tenants, T
- Status
- Closed
- Sector
- Rail, Government, Car parking, Commercial, Automotive, Road, Residential
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Open Contracting Data Standard (OCDS)
ConstructChat
Ask ConstructChat about Elmfield Road Public Realm Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Bromley South, and specifically Elmfield Road, has been identified as a key employment site within the borough with opportunity for development and inward investment. This is supported by the Employment Land and Space Study, completed in 2024, and the Council's Growth Plan (2024-27). Elmfield Road is a 6.58-hectare site adjacent to Bromley South Station, predominantly occupied by office tenants, The Mall Shopping Centre, and an associated NCP car park. Elmfield Road offers a unique regeneration and investment proposition due to its commercial focus and its proximity to Bromley South Station and connectivity to London Victoria. Following the approval of the Council's Growth Plan and publication of the Employment Land and Space Study, an Elmfield Road Steering Group was established. This group brought together property owners, businesses, Network Rail, GLA, central government partners (DBT & Office for Investment), Your Bromley BID, and representatives from the Council's Planning, Highways and Estates Team. This group endorsed the development of a visioning and place proposition exercise for Elmfield Road and the surrounding area. To support this, the Council commissioned a multi-disciplinary team to produce high-level design concepts exploring the urban realm, connectivity, and wider opportunities. The resulting proposals were presented and reviewed at the Elmfield Road Steering Group in October 2024. While the high-level visioning exercise laid a strong foundation for shaping the Elmfield Road project, it was agreed that further work is needed to realise a comprehensive public realm improvement as part of the broader long term regeneration of Bromley South. To deliver this project, the Council is looking to appoint a multi-disciplinary design team, with Lead Consultant, to progress the design through to RIBA Stage 4, developing the scheme to detailed design as part of a package to be tendered for a works contract. Following the works contractor appointment, the Lead Consultant's role will transition to monitoring and advisory support, providing technical oversight, design compliance checks, and client-side assurance during the contractor's completion of the works (RIBA Stages 5 - 7). The Lead Conslultant will be required to assemble and managed a multi-disciplinary team to support the Council in delivering the Elmfield Road public realm improvements. The commission will cover RIBA Stages 1-7 Phase 1 - Pre-works (RIBA Stages 1 - 4): The Lead Consultant will act as design lead, developing the scheme from Preparation and Briefing through to Technical Design. This will include preparation of an Employer's Requirements (ER) package. Phase 2 - Following appointment of works contractor (RIBA Stages 5 - 7): Once the contractor has been appointed, the Lead Design Consultant's role will evolve to that of monitoring and advisory support, acting as client-side technical advisor. This will include contract administration, compliance monitoring, quality review, stakeholder liaison, and post-occupancy evaluation. To support this work, £160k in external funding has been secured through the UK Shared Prosperity Fund, as approved by Executive in March 2025. In addition, £909k from the existing Bromley Town Centre capital budget, sourced from S106 contributions, will be allocated to fund the works contract covering RIBA Stages 5-7. |
Location
Country | United Kingdom (UK) |
Source
Source | Open Contracting Data Standard (OCDS) |
URL |
More Details
Record type | Tender |
Sector | Rail, Government, Car parking, Commercial, Automotive, Road, Residential |
Article published date | 2026-06-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Rail tenders in United Kingdom
- T26-075CRO City of Derry to London Public Service Obligation (PSO) Air Service
- PLACE1285H Hollis Lane Link Road Demolition Basic Asset Protection Agreement
- Road Vehicle Maintenance
- New Generation Road Rail MEWPs (Type D) Vehicles 2 - 4 – Western Route
- RRV & Operator Hire Framework Agreement
- STF JULES Code Migration
- Third party review of National Highways licence self-assurance
- Operations analysis of applications for train services between Newcastle and Brighton and Cardiff and York
