logo

Elmwood Park and Greenhaven Park Picnic Shelter Project

Sector: Metal • Location: Minnesota, United States of America

Source: Minnesota Purchasing Group

Tender
Closed

Proposals must include quotes for both picnic shelters , including : • One to three picnic shelter design options including renderings , photos , or illustrations . o Size : 16 ’ x16 ’ but similar size can be considered for cost or materials efficiencies . o Materials : metal frame and roof . Other materials may be con

Status
Closed
Sector
Metal, Cement
Location
Minnesota, United States of America
Updated
3 Nov 2026
Source
Minnesota Purchasing Group

ConstructChat

Ask ConstructChat about Elmwood Park and Greenhaven Park Picnic Shelter Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Elmwood Park and Greenhaven Park Picnic Shelter Project” is a tender record in Taiyo, linked to the Metal sector. It is issued for works, goods, or services related to Minnesota, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Proposals must include quotes for both picnic shelters , including : • One to three picnic shelter design options including renderings , photos , or illustrations . o Size : 16 ’ x16 ’ but similar size can be considered for cost or materials efficiencies . o Materials : metal frame and roof . Other materials may be considered for aesthetic features . • Site Prep ( include as itemized option ). • Concrete pad installation ( include as itemized option ). Pad should be sized to accommodate the proposed picnic shelter dimensions with a 4 - foot overhang from the drip line . Pad should be minimum 4 ” depth , or thickness needed for shelter design . Other project considerations to note : • Contractors must minimize impacts to the park outside the scope of the project ; contractor will be responsible for any necessary restoration to areas impacted by project construction . • If shelter materials need to be shipped in advance of installation , vendor must coordinate shipping location with city staff . If feasible , materials may be stored at a city facility off site if needed but vendor will be responsible for ultimately getting all materials to the site . • The Parks and Trail System Plan documents are available at cityvadnaisheights . com / ParkPlan .

Location

Country

United States of America (USA)

State

Minnesota

Source

Source

Minnesota Purchasing Group

URL

More Details

Record type

Tender

Sector

Metal, Cement

Article published date

2026-05-13

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender