Emerging Contaminants Improvements
The scope, dates and status of this tender. A free account opens every field.
Work of the Project includes providing and installing a building to cover the filtration system, providing and installing a booster pump including all necessary electrical, controls, piping, etc. required to incorporate it into the distribution system, and the calibration of all SCADA equipment to properly operate the supply and distribution system with all components.
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial
- Location
- Georgia, United States of America
- Updated
- 3 Nov 2026
- Source
- Georgia Procurement Registry
ConstructChat
Ask ConstructChat about Emerging Contaminants Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | under evaluation |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Work of the Project includes providing and installing a building to cover the filtration system, providing and installing a booster pump including all necessary electrical, controls, piping, etc. required to incorporate it into the distribution system, and the calibration of all SCADA equipment to properly operate the supply and distribution system with all components. |
Original sector | Construction / Public Works |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Procurement Registry |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Commercial |
Article published date | 2026-10-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States
- Network Rail Commercial Property Maintenance Framework PSQ
- 66325- Buford Southside WPCP Secondary Clarifier
- Hard Labor Creek Water Transmission Main Phase I
- Road Resurfacing
- Water Reclamation & Conveyance Programmable Logic Controller Uprade - Event No. 12100
- 761 - Thermoelectric Energy Forecasting
- FY26 CDBG Engineering Services
- FY26 CDBG Grant Administration
