Emsworth House Nursing Care Home - Lift Pit and Water Ingress
Complete · United Kingdom
Source: Open Contracting Data Standard (OCDS)
Waterproofing works are required to two existing lift shafts. The works shall involve a specialist internal waterproofing application, to be undertaken by a approved contractor that works with products such as Sika or an equivalent provider. The observed water ingress is considered to be a result of failure or deterioration of the original external waterproofing system. Therefore, the proposed int
- Status
- Closed
- Sector
- Water Supply and Storage, Hospital, Residential, Commercial
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Open Contracting Data Standard (OCDS)
ConstructChat
Ask ConstructChat about Emsworth House Nursing Care Home - Lift Pit and Water Ingress
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Waterproofing works are required to two existing lift shafts. The works shall involve a specialist internal waterproofing application, to be undertaken by a approved contractor that works with products such as Sika or an equivalent provider. The observed water ingress is considered to be a result of failure or deterioration of the original external waterproofing system. Therefore, the proposed internal waterproofing solution is intended to mitigate groundwater penetration into the lift pits. The waterproofing system shall be applied to a minimum height of 150mm above external ground level. Achieving this may necessitate the temporary relocation of existing lift equipment and low-level services within the shafts. Assistance from the term maintenance contractor may be required to disconnect, relocate, and reinstate these services prior to and following the waterproofing works. It is recommended that the works are scheduled during the summer months, when the groundwater table is typically lower. This will allow the lift pits to dry sufficiently to meet the moisture content requirements necessary for the successful application and performance of the waterproofing system. Each lift will need to be taken out of service for approximately 2-3 days to facilitate the works. Appropriate planning and coordination will be required to minimise disruption to building operations to the care and nursing home. |
Location
Country | United Kingdom (UK) |
Source
Source | Open Contracting Data Standard (OCDS) |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Hospital, Residential, Commercial |
Article published date | 2026-08-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United Kingdom
- District Heating Network Performance, Operational Monitoring and Planned Maintenance Services
- Swiftwater and Flood Boat Rescue Operator Training
- Sewer Mapping
- Technology Services Partner Framework (TSPF)
- Provision and installation of burial vaults
- Diagnostic and Capital Equipment and Related Accessories and Services
- Wheal Jane - Reaction Chamber Mixing Tanks VSDs
- Preliminary Market Engagement: Energy Advice and Guidance Service
