End Of The World Long Term Stewardship
Sources sought · Idaho
Source: SAM.gov
2/2/2026- Share attachments 11 and 12, proposed road reconstruction work in the Jungle Bird contractr area 10/22/2025- Share draft documents and information on second site visit 9/30/2025- Industry meeting notes, PowerPoint, NEPA Record of Decsion and project spatial data shared The U.S. Forest Service is re-issuing this formal Request for Information (RFI) in connection with the Nez Perce-Clearwa
- Status
- Prospective
- Sector
- Water Supply and Storage, Residential, Forest Products and Packaging, Biomass, Road, Raw Materials, Commercial, Government
- Location
- Grangeville, Idaho, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about End Of The World Long Term Stewardship
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | sources sought |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | 2/2/2026- Share attachments 11 and 12, proposed road reconstruction work in the Jungle Bird contractr area 10/22/2025- Share draft documents and information on second site visit 9/30/2025- Industry meeting notes, PowerPoint, NEPA Record of Decsion and project spatial data shared The U.S. Forest Service is re-issuing this formal Request for Information (RFI) in connection with the Nez Perce-Clearwater National Forest End of the World (EOTW) Planning Area, and potentially other areas across the forest. The objectives of this initiative are to reduce the risks of insect and disease infestation, wildfires, and to restore and improve forest vegetation and water quality. A long-term 10-Year G-Z Integrated Resource Stewardship Contract is being considered to implement treatments in the planning area. The intent of this RFI is to receive feedback from interested parties during the project development stage. Responses will inform the scope, structure, and feasibility of future solicitations. While no contract will be awarded from this RFI, feedback will directly influence project design. Project Overview and Scope: Approximately 17,000 gross acres are available for treatment across the End of the World planning area. The contract term is anticipated to be up to 10 years. The net acres for treatment are expected to be less after unit layout. Approximately 50+ MMBF of commercial timber is anticipated to be offered over the contract life. Types of Service Work may include: Road maintenance, reconditioning, construction, gravel crushing, and decommissioning. Please note that detailed road design activities such as geometric alignment, engineering drawings, and technical specifications will not be included. Timber removal that will include logging operations conducted by tractor, skyline, shovel, or tethered systems and transportation. Timber sale preparation activities which may include harvest unit layout, GPS traversing, unit boundary marking, interior marking and cruising. Temporary road construction and obliteration. Low value stand treatment including precommercial thinning (PCT), mastication, etc. with a volume removal option. Biomass removal that may include thinning non-merchantable material, slashing, chipping, transportation and other related activities. Slash piling, tethered piling, handline and/or mechanical line construction, and fuel break treatments. Anticipated Terms: Minimum timber value estimates will be based on base rates and/or appraised rates if appropriate as determined from the Forest Service’s Timber appraisal system.? Payment terms for service work items are anticipated to be by the acre, ton or linear foot for most treatments. Road maintenance and reconstruction activities may be priced by the mile or contract quantity. The projects may include both mandatory and optional service items; product value at awarded rates will be used to offset the cost-of-service work items. Davis-Bacon wages and certified payrolls will be required for all Road Construction requirements. Service Contract Act wages will apply towards all non-construction service work requirements. Road construction requirements will be subject to bonding at applicable regulatory thresholds. A site visit is scheduled for October 30, 2025, to discuss the project in detail and share information. There is no planned virtual option for this site visit at this time. Additionally, draft documents are being shared. These materials are being provided for information and review purposes only. This is NOT a Solicitation Announcement, nor is it a Request for Proposal. This request does not obligate the Government in any contract award. Feedback, comments, or questions regarding the draft documents are welcome and may be submitted to the contact person listed below. |
Original sector | Agriculture, Forestry, Fishing and Hunting |
Location
Country | United States of America (USA) |
State | Idaho |
City | Grangeville |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Residential, Forest Products and Packaging, Biomass, Road, Raw Materials, Commercial, Government |
Article published date | 2026-02-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements