logo

Engineering Design Consulting Services Cumberland Sweep Segment F

Closed · Georgia · Last reported Mar 2026

Source: Georgia Purchasing Group

Tender
Closed

Scope : The Consultant shall provide environmental documentation for tasks included in the preliminary and final plans phases of the PDP , stakeholder engagement , public involvement ( if required ), preliminary construction plans , roadway hydraulic and hydrological studies ( if needed ), signing and marking plans , final ri

Status
Closed
Sector
Road, Water Supply and Storage, Power Transmission, Power Generation (CCGT)
Location
Georgia, United States of America
Updated
3 Nov 2026
Source
Georgia Purchasing Group

ConstructChat

Ask ConstructChat about Engineering Design Consulting Services Cumberland Sweep Segment F

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Engineering Design Consulting Services Cumberland Sweep Segment F” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to Georgia, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Scope : The Consultant shall provide environmental documentation for tasks included in the preliminary and final plans phases of the PDP , stakeholder engagement , public involvement ( if required ), preliminary construction plans , roadway hydraulic and hydrological studies ( if needed ), signing and marking plans , final right - of - way ( ROW ) plans ( including revisions ), erosion control plans , staging plans ( if needed ), and final construction plans ( including revisions through project final acceptance ). All required engineering studies are considered part of the scope of services . The Consultant is anticipated to provide : I . Environmental Document • Necessary Assessments of Effects Reports ( Air , Noise , Cultural Resources , Ecology ) • Protected Species Surveys ( as needed ) • NEPA Documents o Assume Categorical Exclusion ( Consultant to confirm ) o NEPA and / or Special Studies Re - evaluation II . Database Preparation • Staking for Right - of - Way • Overhead / Subsurface Utility Engineering ( SUE ) III . Preliminary Plans • Monthly progress meetings • Constructability Review Meeting • Public Information Open House ( if required , prepare for , dry run , attend , and respond to comments ) • Prepare for and hold five ( 5 ) stakeholder meetings • Provide the CCDOT Utility Coordinator with the necessary plans for 1st Utility Submission • Preliminary Roadway Plans ( including but not limited to :) o Typical Sections o Summary of Quantities o Detailed Estimate o Roadway Plans and Profiles o Driveway Profiles o Staging Plans o Staging Profiles and Cross Sections ( if required ) o Drainage Profiles o Cross Sections o Utility Plans o Signing and Marking Plans o Signal Plans o ITS Plans ( if required ) o Lighting Plans o Tree Protection / Landscaping Plans o Irrigation Plans ( if required ) o Wall Plans o ESPCP o Special Construction Details • Pavement Evaluation ( if required ) • Pavement Design ( if required ) • Location and Design Report • Draft Special Provisions • Design Variances / Exceptions ( if required ) • Identification of AV stop locations within the project limits with hardscape , landscape , and grading design and associated special grading sheets • PFPR Participation , Report , and Responses ( joint meeting with CCDOT and GDOT ) • Cost Estimate • Annual update to Cost Estimates IV . Right of Way Plans • Prepare ROW Plans • Coordinate ROW staking • Right of way revisions V . Geotechnical Services • Soil Survey ( if required ) • Wall Foundation Investigation ( if required ) VI . Final Plans • Monthly progress meetings • Stakeholder project update meetings ( up to 5 ) • Provide the CCDOT Utility Coordinator with the necessary plans for 2nd Utility Submission • Final Roadway Plans ( including but not limited to ): o Typical Sections o Summary of Quantities o Detailed Estimate o Roadway Plans and Profiles o Driveway Profiles o Staging Plans ( if required ) o Staging Profiles and Cross Sections ( if required ) o Drainage Profiles o Cross Sections o Utility Plans o Signing and Marking Plans o Signal Plans o ITS Plans ( if required ) o Lighting Plans o Tree Protection / Landscaping Plans o Irrigation Plans ( if required ) o Wall Plans ( if required ) o ESPCP o Special Construction Details • Post Construction Stormwater Report including BMP details • FFPR Participation , Report , and Responses ( joint meeting with CCDOT and GDOT ) • Annual update to Cost Estimates • Cobb County Constructability Review ( final review of pay - items and quantities ) • Finalize Special Provisions

Location

Country

United States of America (USA)

State

Georgia

Source

Source

Georgia Purchasing Group

URL

More Details

Record type

Tender

Sector

Road, Water Supply and Storage, Power Transmission, Power Generation (CCGT)

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender