logo

Engineering Design Services for Municipal Well # 23

Sector: Water Supply and Storage • Location: California, United States of America

Source: California Purchasing Group

Tender
Closed

PROJECT DESCRIPTION : Municipal Well # 23 The City project proposes to install a new municipal water production well and install approximately 10 , 500 feet of 16 - inch watermain from Yosemite Avenue to Bellevue Road and approximately 6 , 000 feet of 16 - inch watermain from the proposed well site to Lake Road

Status
Closed
Sector
Water Supply and Storage, Residential, Consumer Products, Road, Government
Location
California, United States of America
Updated
3 Nov 2026
Source
California Purchasing Group

ConstructChat

Ask ConstructChat about Engineering Design Services for Municipal Well # 23

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Engineering Design Services for Municipal Well 23” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to California, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

PROJECT DESCRIPTION : Municipal Well # 23 The City project proposes to install a new municipal water production well and install approximately 10 , 500 feet of 16 - inch watermain from Yosemite Avenue to Bellevue Road and approximately 6 , 000 feet of 16 - inch watermain from the proposed well site to Lake Road along a future subdivision road . ( See Exhibit “ A ” and “ B ”) The proposed well site is a 0 . 52 acres site situated in the proposed Virgina Smith Trust Subdivision labeled as Lot 48 . The site is located approximately 2 , 500 feet east of Lake Road and 1 , 000 feet north of Cardella Road in the northeast portion of Merced . The work to be completed by successful proposer under this contract , hereinafter “ Consultant ”, includes all labor , materials and equipment for the design and construction management of the proposed municipal well and watermain installation . The general work consists of : Task 1 ) Obtaining appropriate permits , survey site , site preparation , test borehole drilling , collection of drill cuttings of the formations encountered , preparation of driller ’ s log of borehole lithology , laboratory analysis of water samples , summary report ; and , Task 2 ) Design and develop bidding plans and specifications for the municipal well drilling and construction , design and develop bidding plans and specifications for pump station and water main construction , provide bidding and construction management , provide engineer ’ s estimates of costs . Provide necessary survey mapping to perform this task . Task 3 ) Design and develop bidding plans and specifications for the installation of the 16 ” watermain from Yosemite Avenue to Bellevue Road , provide bidding and construction management , provide engineer ’ s estimates of costs . Provide necessary survey mapping to perform this task . Task 4 ) Design and develop bidding plans and specifications for the installation of the 16 ” watermain from Lake Road to the new well site , provide bidding and construction management , provide engineer ’ s estimates of costs . Provide necessary survey mapping to perform this task . GENERAL SCOPE OF CONSULTANT SERVICES Perform all project services in coordination with and under the supervision of the City ’ s assigned project manager . Proposed Scope of Services to include , but not limited to : TASK 1 . 0 - INSTALL TEST BOREHOLE AND EVALUATE SITE CONDITIONS Task 1 . 1 – Obtain Information and Coordinate with the City The initial task is to review available information on existing City municipal well sites , water management plans , and general criteria the City wishes to have considered for the new production well . This includes , but is not limited to : • Well production rates , local conditions and geology , drilling issues , drilling / development fluids , and solids management and disposal ; • Existing water mains , other utilities and Fairfield Canal conveyance . • Evaluation of known and unknown potential groundwater quality impacts . Other City municipal well sites have experienced water quality issues for nitrates , arsenic , and volatile organic compounds such as Methyl Tertiary Butyl Ether ( MTBE ), Trilchloroethylene ( TCE ) and Perchloroethylene ( PCE ). In addition , there are active dairy operations in the vicinity of the project site . The Consultant shall perform a site reconnaissance / survey and confirm the general site and surrounding areas ’ conditions . Task 1 . 2 – Prepare Recommendation Report The Consultant shall prepare a report that includes recommendations for the successful completion of the work . The report shall include at a minimum the following elements : 1 ) Project construction schedule 2 ) Current plot plan and cross section diagrams as necessary to demonstrate existing conditions for permit applications . Site plan to include drill rig and supporting equipment layout , fluids and casing storage , sanitary facilities , etc . 3 ) Rationale for test borehole parameters including diameter and total depth 4 ) Proposed drilling method including drilling fluids management plan

Location

Country

United States of America (USA)

State

California

Source

Source

California Purchasing Group

URL

More Details

Record type

Tender

Sector

Water Supply and Storage, Residential, Consumer Products, Road, Government

Article published date

2026-03-27

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender