logo

Engineering Review of MARL Project

One of 4,329 tenders Taiyo tracks in West Virginia.

Source: West Virginia Purchasing Group

Tender
Closed

Project and Goals : The project goals and objectives are listed below . Vendors should discuss any anticipated concepts and proposed methods of approach for achieving each of the listed goals and objectives : The consultant will serve in an advisory capacity to the Commission Staff in evaluating the following

Status
Closed
Sector
Government
Location
West Virginia, United States of America
Updated
3 Nov 2026
Source
West Virginia Purchasing Group

ConstructChat

Ask ConstructChat about Engineering Review of MARL Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Engineering Review of MARL Project” is a tender record in Taiyo, linked to the Government sector. It is issued for works, goods, or services related to West Virginia, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Project and Goals : The project goals and objectives are listed below . Vendors should discuss any anticipated concepts and proposed methods of approach for achieving each of the listed goals and objectives : The consultant will serve in an advisory capacity to the Commission Staff in evaluating the following key aspects of the project application . 2 . 1 The overall analysis regarding the need for the MARL project : 2 . 1 . 1 Review of any analysis performed by PJM Interconnection , LLC and / or the Applicant relating to the MARL Transmission Line including but not limited to : 2 . 1 . 1 . 1 Load Forecasting 2 . 1 . 1 . 2 New Generator inclusion or exclusion 2 . 1 . 1 . 3 Review of generator dispatch to avoid or mitigate overloads 2 . 1 . 1 . 4 Manual adjustments made in n - 1 - 1 contingencies 2 . 1 . 1 . 5 Studies of reconductoring and re - tensioning 2 . 1 . 1 . 6 Reliability Pricing Model ( RPM ) inclusion 2 . 1 . 1 . 7 Evaluation of other alternative transmission options 2 . 1 . 2 Review of the application to determine if it meets the requirements of the Commission ’ s Rules and Regulations for the Government of Electric Utilities , Rule 9 . 2 . 1 . 3 If a need is found to exist : 2 . 1 . 3 . 1 Determine whether that need should be met with non - transmission alternatives such as new generation or expanded demand response 2 . 1 . 3 . 2 Assess whether transmission expansion is the most cost - effective alternative 2 . 1 . 3 . 3 Address whether MARL is the best transmission alternative to meet the need while balancing all of the competing interests of the State and its citizens . 2 . 1 . 4 Address the issues of whether the proposed MARL project provides the best course of action regarding construction options , such as line sizing and selected materials to meet the need , while balancing all of the competing interests of the State and its citizens . 2 . 2 The economic impacts as a result of the MARL project : 2 . 2 . 1 Analyze the potential economic impacts , either positive or negative , as a result of the MARL Project to the State and its citizens . 2 . 2 . 2 Evaluate the information provided by the applicant to confirm or deny any claims of economic impacts to the State and its citizens .

Location

Country

United States of America (USA)

State

West Virginia

Source

Source

West Virginia Purchasing Group

URL

More Details

Record type

Tender

Sector

Government

Article published date

2026-05-02

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender