Engineering Services
Sector: Water Supply and Storage • Location: Nevada, United States of America
Source: Nevada Purchasing Group
Task 1 : Project Management and Coordination • Develop a comprehensive work plan outlining project phases , deliverables , and timelines in accordance with the overall grant timeline . • Coordinate with NCWD staff , stakeholders , and regulatory agencies throughout project development . • Support NCWD with public meetings ( up
- Status
- Closed
- Sector
- Water Supply and Storage
- Location
- Nevada, United States of America
- Updated
- 3 Nov 2026
- Source
- Nevada Purchasing Group
ConstructChat
Ask ConstructChat about Engineering Services
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Task 1 : Project Management and Coordination • Develop a comprehensive work plan outlining project phases , deliverables , and timelines in accordance with the overall grant timeline . • Coordinate with NCWD staff , stakeholders , and regulatory agencies throughout project development . • Support NCWD with public meetings ( up to four ) and communications as needed . Task 2 : Data Research and Final Site Selection • Review and evaluate readily available geotechnical data for proposed RIB locations . • Propose potential data gaps and design requirements . • Evaluate regulatory requirements and assist with obtaining permitting . Task 3 : Geotechnical Testing and Preliminary Design • Develop Preliminary Engineering Reports ( PERs ) in accordance with BOR guidelines . • Develop RIB design documents at the 30 %, 60 %, and 90 % level . • Provide engineering design and analysis for RIB infrastructure . • Assess hydrogeological and environmental considerations related to RIB development . Task 4 : Final Design and Guidance Document Preparation • Assist with development of a Guidance Document for future RIB planning , as required . • Prepare independent cost estimates for future construction of each RIB . Task 5 : Additional Services • Serve as a liaison between the NCWD and regulatory agencies such as the Nevada Division of Environmental Protection ( NDEP ), Nevada Division of Water Resources ( NDWR ), and the BOR . • Provide technical expertise to the NCWD and provide program / permit updates and reports , as necessary . • Other services as assigned by the NCWD General Manager . |
Location
Country | United States of America (USA) |
State | Nevada |
Source
Source | Nevada Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage |
Article published date | 2026-05-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
