Engineering Study to Evaluate HVAC Systems Upgrades at 4 locations
Sector: Water Supply and Storage • Location: Connecticut, United States of America
Source: Connecticut Purchasing Group
The selected firm will be responsible for , but not limited to , the following tasks : 3 . 1 Data Collection and Assessment : 3 . 1 . 1 Review of existing building plans , equipment specifications , and maintenance records . 3 . 1 . 2 On - site inspection and inventory of all HVAC equipment , including chillers , boilers , a
- Status
- Closed
- Sector
- Water Supply and Storage, Power Transmission, Solar, Geothermal, Natural Gas, Power Generation (CCGT), Commercial
- Location
- Connecticut, United States of America
- Updated
- 3 Nov 2026
- Source
- Connecticut Purchasing Group
ConstructChat
Ask ConstructChat about Engineering Study to Evaluate HVAC Systems Upgrades at 4 locations
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The selected firm will be responsible for , but not limited to , the following tasks : 3 . 1 Data Collection and Assessment : 3 . 1 . 1 Review of existing building plans , equipment specifications , and maintenance records . 3 . 1 . 2 On - site inspection and inventory of all HVAC equipment , including chillers , boilers , air handling units , fan coil units , terminal units , controls , and associated piping and ductwork . 3 . 1 . 3 Measurement of system performance parameters , such as airflow , temperatures , and pressures , where feasible . 3 . 1 . 4 Assessment of the building envelope , insulation , windows , and doors as they relate to thermal performance . 3 . 1 . 5 Analysis of historical energy consumption data ( utility bills ) to establish a baseline . 3 . 2 Energy Modeling and Analysis : 3 . 2 . 1 Create an energy model of the existing building and HVAC systems . 3 . 2 . 2 Perform a detailed energy use analysis to identify major energy consumers and areas for potential savings . 3 . 2 . 3 Develop a series of upgrade options , ranging from minor improvements to full system replacement . 3 . 3 Development of Upgrade Scenarios : 3 . 3 . 1 For each upgrade scenario , provide a detailed description of the proposed equipment , system configuration , and control strategies . Examples of potential scenarios include : 3 . 3 . 1 . 1 Replacement with high - efficiency like - for - like equipment . 3 . 3 . 1 . 2 Implementation of Variable Refrigerant Flow ( VRF ) systems . 3 . 3 . 1 . 3 Installation of a new Building Automation System ( BAS ) or controls upgrade . 3 . 3 . 1 . 4 Integration of renewable energy sources ( e . g ., solar thermal , groundsource heat pumps ). 3 . 3 . 1 . 5 Air - side and water - side economizer analysis . 3 . 3 . 1 . 6 Ductwork and piping modifications . 3 . 3 . 2 For each scenario , provide a detailed energy savings estimate , including projected reduction in electricity and natural gas consumption . 3 . 4 Financial Analysis : 3 . 4 . 1 For each upgrade scenario , provide a preliminary cost estimate , including equipment , installation , and engineering fees . 3 . 4 . 2 Calculate the simple payback period , Return on Investment ( ROI ), and Net Present Value ( NPV ) for each option . 3 . 4 . 3 Identify potential utility rebates , grants , or other incentives available for the proposed upgrades . 3 . 5 Final Report and Presentation : 3 . 5 . 1 Submit a comprehensive final report detailing the findings , analyses , and recommendations . The report should include : 3 . 5 . 1 . 1 A summary of the current HVAC system ' s condition . 3 . 5 . 1 . 2 A detailed description of each upgrade scenario . 3 . 5 . 1 . 3 The energy and cost savings analysis for each option . 3 . 5 . 1 . 4 A prioritized list of recommended upgrades based on efficiency , practicality , and financial return . 3 . 5 . 1 . 5 A conceptual design and schematic drawings for the top recommended option . 3 . 5 . 2 Present the final findings and recommendations to the Public Building Commission and Town Council . |
Location
Country | United States of America (USA) |
State | Connecticut |
Source
Source | Connecticut Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Power Transmission, Solar, Geothermal, Natural Gas, Power Generation (CCGT), Commercial |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
