Environmental Remediation and Demolition at 4690 and 4700 Goodfellow

The scope, dates and status of this tender. A free account opens every field.

Source: Missouri Purchasing Group

Tender
Closed

The comprehensive scope of work for the Remedial Action & Demolition Manual at 4690 & 4700 Goodfellow Boulevard involves the complete abatement , environmental remediation , and demolition of seven vacant industrial buildings , followed by full site restoration , to achieve closure under the Missouri Brownfield Voluntary

Status
Closed
Sector
Road, Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Metal, Power Generation (CCGT), Government, Manufacturing (Industrial), Car parking, Cement, Automotive
Location
Missouri, United States of America
Updated
3 Nov 2026
Source
Missouri Purchasing Group

ConstructChat

Ask ConstructChat about Environmental Remediation and Demolition at 4690 and 4700 Goodfellow

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Environmental Remediation and Demolition at 4690 and 4700 Goodfellow” is a tender record in Taiyo, linked to the Road sector. It is issued for works, goods, or services related to Missouri, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The comprehensive scope of work for the Remedial Action & Demolition Manual at 4690 & 4700 Goodfellow Boulevard involves the complete abatement , environmental remediation , and demolition of seven vacant industrial buildings , followed by full site restoration , to achieve closure under the Missouri Brownfield Voluntary Cleanup Program ( BVCP ). Contractor Responsibility and Governing Documents : The selected Contractor shall furnish all supervision , labor , materials , equipment , transportation , permits , and disposal services required to execute the full scope of work , and is responsible for complying with the specifications and performance criteria in the Remedial Action & Demolition Manual ( Appendix 1 ) and a QAPP ( Appendix 2 ). The Contractor acknowledges that all quantities provided in the Manuals ( e . g ., for ACMs , heavy metals dust ) are estimates , and the contractor must physically verify all site conditions and quantities before submitting a bid for the required lump sum scope . The contractor is responsible for the inventory of all household hazardous wastes / universal wastes ( fluorescent lights , PCB ballasts , etc ) required to be removed from buildings prior to demolition . Mandatory Project Phases : The Contractor ' s work must be performed sequentially in four phases , as mandated by the Manual : 1 . Phase 1 – Environmental Abatement and Heavy Metal Dust Decontamination : Includes the furnishing of all labor and services for the full abatement , transport , and lawful disposal of all hazardous materials , including Asbestos - Containing Materials ( ACMs ), Household Hazardous Wastes ( HHW ), Universal Waste ( fluorescent lights , PCB ballasts , etc .), and the Heavy Metal Dust Decontamination of approximately 170 , 000 SF of interior surfaces to prepare the buildings for safe demolition . 2 . Phase 2 – Utility Disconnection : Includes disconnecting and capping all utilities ( gas , sewer , electrical ) in compliance with local codes . 3 . Phase 3 – Demolition and Debris Removal : Includes the complete mechanical demolition and removal of all seven ( 7 ) buildings , including all foundations , basements , sidewalks , and parking lots , and the removal and disposal of all demolition debris from the site . This phase also includes the removal of all existing asphaltic pavement and concrete ( except for defined roadways and perimeter fencing ) from the vacant 4690 Goodfellow lot . 4 . Phase 4 – Site Restoration : Includes complete backfill of all voids , site grading , seeding , and strawing of all disturbed areas to achieve a neat , well - drained appearance . All work must be completed no later than August 1 , 2026 .

Location

Country

United States of America (USA)

State

Missouri

Source

Source

Missouri Purchasing Group

URL

More Details

Record type

Tender

Sector

Road, Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Metal, Power Generation (CCGT), Government, Manufacturing (Industrial), Car parking, Cement, Automotive

Article published date

2026-04-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender