EOI - Ethiopia - Project Completion Environmental and Social Audit - Integrated Agro-Industrial Parks Support Project
One of 1,958 tenders Taiyo tracks in Ethiopia.
Source: African Development Bank (AfDB)
The services included under this project are:
Operational Safeguards (OS) Performance
OS 1 (E&S Assessment): Review the final effectiveness of the ESMP in mitigating impacts from infrastructure such as Wastewater Treatment Plants (WWTP).
OS 2 (Involuntary Resettlement): Conduct a final review of RAP implementation, focusing on the relocation of 200+ individuals and the adequacy of fair
- Status
- Prospective
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Commercial, Waste Processing and Treatment, Residential
- Location
- Addis Ababa, Ethiopia
- Updated
- 3 Nov 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about EOI - Ethiopia - Project Completion Environmental and Social Audit - Integrated Agro-Industrial Parks Support Project
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | eoi |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The services included under this project are: Operational Safeguards (OS) Performance OS 1 (E&S Assessment): Review the final effectiveness of the ESMP in mitigating impacts from infrastructure such as Wastewater Treatment Plants (WWTP). OS 2 (Involuntary Resettlement): Conduct a final review of RAP implementation, focusing on the relocation of 200+ individuals and the adequacy of fair compensation. OS 3-5 (Biodiversity, Pollution, Labor): Evaluate final outcomes regarding resource efficiency, waste management, and Occupational Health and Safety (OHS) performance during the construction-to-operation transition. Final Capacity Assessment Using the Capacity Needs Assessment Checklist, the auditor will perform a final evaluation of the E&S expert. ESMS Maturity: Determine if a functional, internal ESMS is integrated into the park administration's daily operations. Grievance Redress: Evaluate the lifetime performance of the Grievance Redress Mechanism (GRM) and confirm that all project related complaints are closed or have a clear path to resolution. Stakeholder & Social Outcomes SEA/SH and GBV: Verify the effectiveness of the systems put in place to address Sexual Exploitation, Abuse, and Gender-Based Violence. Community Satisfaction: Conduct final surveys to gauge beneficiary satisfaction and the visibility of positive socio-economic impacts. |
Original sector | Agro-Industrial Sector |
Location
Country | Ethiopia |
City | Addis Ababa |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Manufacturing (Industrial), Commercial, Waste Processing and Treatment, Residential |
Article published date | 2026-07-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in Ethiopia
- Second Ethiopia Urban Water Supply and Sanitation Project: Procurement Construction of Fecal Sludge Treatment Plant (FSTP) for Deghabour Town
- Second Ethiopia Urban Water Supply and Sanitation Project: Supervision consultant for fecal sludge management system construction for Jimma and Nekemte-Oromia- By Oromia Water Bureau
- Food Systems Resilience Program for Eastern and Southern Africa: Construction works of 4 New SSIPs at different FSRP woredas, under Oromia Irrigation and Pastoral Area Development Bureau
- Horn of Africa - Groundwater for Resilience Program: Procurement of Woreda Support Group for 17 Woredas of Amhara, Oromia, Central Ethiopia, South Ethiopia and Sidama Regions in 4 Different Lots by Ministry of Water and Energy
- SPN - Ethiopia - Procurement of Civil Works and its Auxiliary Structures, Supply, Laying, Installation of Pipes and Fittings, Design Review, Supply and Installation of Electromechanical Equipment of Ebala-Adilo Town Water Supply System
- One WASH—Consolidated Water Supply, Sanitation, and Hygiene Account Project (One WASH—CWA): Procurement of Drilling, Construction and Pumping Test of three Deep Production Wells for Kumbi Woreda Multi Village Water Supply Project in East Harrage Zone (at Jiddo Well field) by MoWE
- Sanitary / Hydraulic Engineer
- Access to Distributed Electricity and Lighting in Ethiopia (ADELE): Reference:- Procurement of Package I, Plant Design, Supply, Installation, Test and Commissioning of Solar Mini – Grids Projects in 15 mini grids including six months Operation and Maintenances (Lot 1 & Lot 2)
