ESB US20 MP79 . 55 - 86 . 52 Storm Inlet Replacements
The scope, dates and status of this tender. A free account opens every field.
Source: Oregon Purchasing Group
The purpose of this RFCQ is to establish a Contract to remove and replace 3 storm sewer catch basins along US20 over the Santiam Pass near Suttle Lake for the benefit of ODOT . The work contemplated under the Contract includes all labor , materials , transportation , equipment and services for , and incide
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Cement
- Location
- Oregon, United States of America
- Updated
- 3 Nov 2026
- Source
- Oregon Purchasing Group
ConstructChat
Ask ConstructChat about ESB US20 MP79 . 55 - 86 . 52 Storm Inlet Replacements
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The purpose of this RFCQ is to establish a Contract to remove and replace 3 storm sewer catch basins along US20 over the Santiam Pass near Suttle Lake for the benefit of ODOT . The work contemplated under the Contract includes all labor , materials , transportation , equipment and services for , and incidental to , the completion of all construction Work in connection with the project described in the Contract Documents . DESCRIPTION OF WORK : The work to be done under the Contract consists of the following : Contractor shall remove and replace 3 storm sewer catch basins along US20 over the Santiam Pass near Suttle Lake . Installed inlets to be a Type “ G - 2MA ” ( RD364 ) intended to match the existing inlets ( grate just lower than flush with surrounding surface , no curb , precast or cast in place concrete apron around inlet , etc ..) Field fit concrete apron with project manager . Grate to be Type 2 ( bicycle safe ). Grates are unremovable ( either due to damage from traffic or welded on ) so maintenance was unable to open them and verify inlet / outlet pipe diameter and material , but contractors should assume 12 ” CMP for existing reconnections . Contractor shall be fully responsible for the sawcutting and removal of the roadway debris , transportation of debris , and final debris disposal . Contractor shall provide all management , supervision , labor , materials , and equipment necessary for the efficient and effective removal , replacement , and surface restoration at each work site . Contractor shall be responsible for dust control and all other environmental safeguards and protections as necessary . All such safeguards and protections shall comply with federal and state laws and regulations regarding same . All debris shall be disposed in compliance with federal , state , or local laws , regulations , or guidelines providing for proper disposal of the particular type of debris . Contractor shall be responsible for tracking quantities of materials removed from the site and will notify the project manager if measured quantities differ from the estimated ones provided in this solicitation . |
Location
Country | United States of America (USA) |
State | Oregon |
Source
Source | Oregon Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Waste Processing and Treatment, Water Supply and Storage, Cement |
Article published date | 2026-05-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Waste Processing and Treatment tenders in United States of America
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Annual Construction Contract For Utility Replacement 2022A
- FY23 Sewer Rehabilitation
- Fire Station 32 ADA Restroom Improvements
- Foothills Trail East Puyallup McMillin Trailhead Improvements
- Pipeline Trail Phase 1 Project
