logo

ESB US20 MP79 . 55 - 86 . 52 Storm Inlet Replacements

The scope, dates and status of this tender. A free account opens every field.

Source: Oregon Purchasing Group

Tender
Closed

The purpose of this RFCQ is to establish a Contract to remove and replace 3 storm sewer catch basins along US20 over the Santiam Pass near Suttle Lake for the benefit of ODOT . The work contemplated under the Contract includes all labor , materials , transportation , equipment and services for , and incide

Status
Closed
Sector
Waste Processing and Treatment, Water Supply and Storage, Cement
Location
Oregon, United States of America
Updated
3 Nov 2026
Source
Oregon Purchasing Group

ConstructChat

Ask ConstructChat about ESB US20 MP79 . 55 - 86 . 52 Storm Inlet Replacements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “ESB US20 MP79 . 55 - 86 . 52 Storm Inlet Replacements” is a tender record in Taiyo, linked to the Waste Processing and Treatment sector. It is issued for works, goods, or services related to Oregon, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The purpose of this RFCQ is to establish a Contract to remove and replace 3 storm sewer catch basins along US20 over the Santiam Pass near Suttle Lake for the benefit of ODOT . The work contemplated under the Contract includes all labor , materials , transportation , equipment and services for , and incidental to , the completion of all construction Work in connection with the project described in the Contract Documents . DESCRIPTION OF WORK : The work to be done under the Contract consists of the following : Contractor shall remove and replace 3 storm sewer catch basins along US20 over the Santiam Pass near Suttle Lake . Installed inlets to be a Type “ G - 2MA ” ( RD364 ) intended to match the existing inlets ( grate just lower than flush with surrounding surface , no curb , precast or cast in place concrete apron around inlet , etc ..) Field fit concrete apron with project manager . Grate to be Type 2 ( bicycle safe ). Grates are unremovable ( either due to damage from traffic or welded on ) so maintenance was unable to open them and verify inlet / outlet pipe diameter and material , but contractors should assume 12 ” CMP for existing reconnections . Contractor shall be fully responsible for the sawcutting and removal of the roadway debris , transportation of debris , and final debris disposal . Contractor shall provide all management , supervision , labor , materials , and equipment necessary for the efficient and effective removal , replacement , and surface restoration at each work site . Contractor shall be responsible for dust control and all other environmental safeguards and protections as necessary . All such safeguards and protections shall comply with federal and state laws and regulations regarding same . All debris shall be disposed in compliance with federal , state , or local laws , regulations , or guidelines providing for proper disposal of the particular type of debris . Contractor shall be responsible for tracking quantities of materials removed from the site and will notify the project manager if measured quantities differ from the estimated ones provided in this solicitation .

Location

Country

United States of America (USA)

State

Oregon

Source

Source

Oregon Purchasing Group

URL

More Details

Record type

Tender

Sector

Waste Processing and Treatment, Water Supply and Storage, Cement

Article published date

2026-05-11

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender