Escambia Co DHR Restrooms , family room , and kitchen Update
Sector: Residential • Location: Alabama, United States of America
Source: Alabama Purchasing Group
Escambia Co DHR Remodel 1 . Project OverviewThis project consists of interior finish repairs and fixture replacements within the Escambia County DHR facility . The work is limited to replacement of existing fixtures and finishes and does not include any structural modifications , system redesign , or construction a
- Status
- Closed
- Sector
- Residential, Steel, Commercial
- Location
- Alabama, United States of America
- Updated
- 3 Nov 2026
- Source
- Alabama Purchasing Group
ConstructChat
Ask ConstructChat about Escambia Co DHR Restrooms , family room , and kitchen Update
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Escambia Co DHR Remodel 1 . Project OverviewThis project consists of interior finish repairs and fixture replacements within the Escambia County DHR facility . The work is limited to replacement of existing fixtures and finishes and does not include any structural modifications , system redesign , or construction activity . All work will be performed while the office remains operational . The supplier must coordinate activities to ensure continuous building operations and safe access for employees and clients . 2 . Areas Included • Women ’ s Employee Bathroom • Men ’ s Employee Bathroom • Family Bathroom • Kitchen3 . Scope of WorkWomen ’ s Employee Bathroom • Remove existing countertops and install new quartz countertops ( Mystic White or approved equal )• Remove and replace existing sinks with rectangular undermount sinks • Remove and replace existing faucets with chrome Delta Foundations or approved equal • Remove and replace mirrors • Remove and replace existing wall tile from the current tile height around the room • Remove existing light fixtures and install new LED light fixtures in existing locations • Perform associated plumbing connections related to fixture replacement onlyMen ’ s Employee Bathroom • Remove existing countertops and install new quartz countertops ( Mystic White or approved equal )• Remove and replace existing sinks with rectangular undermount sinks • Remove and replace existing faucets with chrome Delta Foundations or approved equal • Remove and replace mirrors • Remove and replace existing wall tile from the current tile height around the room • Remove existing light fixtures and install new LED light fixtures in existing locations • Perform associated plumbing connections related to fixture replacement onlyFamily Bathroom • Replace existing sink faucet • Replace existing wall tile as needed in existing locations • No changes to room layout or plumbing configurationKitchen • Remove existing countertops and install new granite countertops with 4 - inch backsplash • Remove existing sink and install new drop - in stainless steel sink • Remove existing faucet and install new faucet with external sprayer • Perform associated plumbing connections related to fixture replacement onlyElectrical ( Interior Only )• Remove existing lighting fixtures in designated areas • Install new LED lighting fixtures using existing wiring and mounting locations • No electrical system upgrades , redesigns , or circuit modifications are included4 . MaterialsMaterials shall be replacement - in - kind or equivalent commercial - grade finishes .• Bathroom Countertops : Mystic White Quartz or approved equal • Kitchen Countertops : Granite with 4 - inch backsplash • Sinks : Rectangular undermount ( bathrooms ); stainless steel drop - in ( kitchen )• Faucets : Chrome Delta Foundations or approved equal • Lighting : LED fixtures compatible with existing wiring • Tile : Commercial - grade wall tile5 . General Requirements • This project is limited to non - structural interior repairs and fixture replacements • No load bearing , structural , or building system redesign work is included • Supplier shall provide all labor , materials , tools , and debris removal • All work must comply with applicable building codes and safety standards • Work areas must remain clean and safe throughout the project6 . Clean - Up • Daily clean - up of work areas • Final clean - up upon completion • Removal of all debris and discarded materials from the site7 . Completion • Work is considered complete upon final walkthrough and acceptance • Any deficiencies identified must be corrected prior to final acceptancePayment Terms : Net 30 Paid in Arrears After Completion of Service . No Invoicing Prior to Completion of Service . |
Location
Country | United States of America (USA) |
State | Alabama |
Source
Source | Alabama Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Residential, Steel, Commercial |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
