logo

Existing Roadway Paving / Iof St. Thomas, Usvi

Sector: Commercial • Location: St Thomas, Virgin Islands, United States of America

Source: SAMGOVCO

Tender
Combined Synopsis/Solicitation

The purpose of this requirement is to improve the roadway system at the FEMA St. Thomas Initial Operating Facility (STT IOF), also known as the Mosquito Point Complex (MPC), located in St. Thomas, U.S. Virgin Islands. The work includes site assessment, site preparation, subgrade preparation, compaction, proof rolling, resurfacing existing asphalt roadways, and paving the dirt/gravel access road le

Status
Closed
Sector
Commercial, Bridge, Power Generation (CCGT), Cement, Residential, Road
Location
St Thomas, Virgin Islands, United States of America
Updated
3 Nov 2026
Source
SAMGOVCO

ConstructChat

Ask ConstructChat about Existing Roadway Paving / Iof St. Thomas, Usvi

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Existing Roadway Paving / Iof St. Thomas, Usvi” is a tender record in Taiyo, linked to the Commercial sector. It is issued for works, goods, or services related to St Thomas, Virgin Islands, United States of America.

Participants

Not available for this record.

Status

Original status

combined synopsis/solicitation

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The purpose of this requirement is to improve the roadway system at the FEMA St. Thomas Initial Operating Facility (STT IOF), also known as the Mosquito Point Complex (MPC), located in St. Thomas, U.S. Virgin Islands. The work includes site assessment, site preparation, subgrade preparation, compaction, proof rolling, resurfacing existing asphalt roadways, and paving the dirt/gravel access road leading to Communications Bunker #3. The project also includes an add/deduct alternate for paving the dirt/gravel access road leading to Bunker #2. These improvements are required to enhance safety, support heavy vehicle and forklift traffic, improve operational access, reduce roadway hazards, and support FEMA mission operations. The FEMA STT IOF/MPC is located at the end of Mosquito Point in St. Thomas, U.S. Virgin Islands. The facility consists of approximately 20 acres of multi-level rocky terrain in a tropical environment and includes approximately one mile of roadways and approach ways. The site contains approximately: 0.45 miles of concrete roads 0.39 miles of asphalt roads 0.14 miles of dirt/gravel roads FEMA requires resurfacing of the existing asphalt roadways and paving of the dirt/gravel access road to Communications Bunker #3. The Bunker #3 access road is mission critical and has been the location of two recorded forklift accidents, including one where the driver was ejected. Most existing asphalt roadways were recently trenched for underground electrical power and fiber conduit installation. These trenched areas require preparation, subgrade placement, compaction, proof rolling, and resurfacing.

Original sector

Construction

Location

Country

United States of America (USA)

State

Virgin Islands

City

St Thomas

Source

Source

SAMGOVCO

URL

More Details

Record type

Tender

Sector

Commercial, Bridge, Power Generation (CCGT), Cement, Residential, Road

Article published date

2026-09-29

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender