Expanded Metal-Valdosta State Prison
Bids closed Aug 2026 · Georgia · Last reported Jul 2026
This Request for Quotes (Expanded Metal-Valdosta State Prison) is being issued to establish a one time buy with a qualified supplier who will meet the State Entity¿s needs as described in this Sourcing Event. This RFQ process will be conducted to gather and evaluate responses from supplier for potential award. All qualified suppliers are invited to participate by submitting responses, as further d
- Status
- Closed
- Sector
- Steel, Metal
- Location
- Georgia, United States of America
- Updated
- 3 Nov 2026
- Source
- Georgia Procurement Registry
ConstructChat
Ask ConstructChat about Expanded Metal-Valdosta State Prison
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | This Request for Quotes (Expanded Metal-Valdosta State Prison) is being issued to establish a one time buy with a qualified supplier who will meet the State Entity¿s needs as described in this Sourcing Event. This RFQ process will be conducted to gather and evaluate responses from supplier for potential award. All qualified suppliers are invited to participate by submitting responses, as further defined below. After evaluating all suppliers¿ responses received prior to the closing date of this Sourcing Event and resolution of any contract exceptions, the preliminary results of the RFQ process will be publicly announced, including the names of all participating suppliers and the evaluation results. Subject to the protest process, final contract award(s) will be publicly announced thereafter. |
Original sector | Goods |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Procurement Registry |
URL |
More Details
Record type | Tender |
Sector | Steel, Metal |
Article published date | 2026-10-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Steel tenders in United States
- Mill and overlay, replacement of 1 structure; Involving stripping, storing, and placing topsoil, excavation, reinforcing subgrade, placing road base, asphalt pavement, structural steel, riprap, and structural concrete, and installing fence on WYO 59
- Bridge rehabilitation and electrical upgrades; Involving removing concrete, excavation, replacing concrete slabs, placing structural steel, installing bridge railing and sheet piles, placing approach slabs, riprap, bridge deck overlay, and structural
- Bridge rehabilitation and electrical upgrades; Involving removing concrete, excavation, replacing concrete slabs, placing structural steel, installing bridge railing and sheet piles, placing approach slabs, riprap, bridge deck overlay, and structural
- Bridge replacement (1 concrete bridge); Involving installing cofferdams, removing one concrete bridge, placing structural steel, installing bridge railing, pedestrian railing, and steel piling, placing riprap, and installing reinforcing steel and pla
- Bridge replacement (1 Structure); Involving removing one steel bridge, excavation, grading, placing road base and prestressed precast concrete girders, installing bridge railing and steel piling, placing riprap, installing reinforcing steel, and plac
- DR19309, DR19004 & DR19622 combined Bridge repairs (3 structures); Involving installing controls for lead paint removal, removing concrete, placing structural steel, installing bridge railing, paint removal and repair, and repairing structural concre
- Slide Repair; Involving excavation; stripping, storing, and placing topsoil; placing erosion control measures, asphalt pavement, slide stabilization rock, and shotcrete; and installing reinforcing steel and timber lagging on US 26/89 beginning at RM
- Slide Repair; Involving excavation; stripping, storing, and placing topsoil; placing erosion control measures, asphalt pavement, slide stabilization rock, and shotcrete; and installing reinforcing steel and timber lagging on US 26/89 beginning at RM
