Extended Outdoor Dining Barrier Placement and Removal Services
Sector: Biomass • Location: New Hampshire, United States of America
Source: New Hampshire Purchasing Group
Barrier Placement • Pickup barriers from Four Hills Landfill . Contractor shall supply their own labor and equipment ( trucks , flatbed trailers , front end loader , etc .) for loading / unloading and hauling barrier between the landfill and downtown . Landfill to be accessed during times when the gate is open for D
- Status
- Closed
- Sector
- Biomass, Waste Processing and Treatment
- Location
- New Hampshire, United States of America
- Updated
- 3 Nov 2026
- Source
- New Hampshire Purchasing Group
ConstructChat
Ask ConstructChat about Extended Outdoor Dining Barrier Placement and Removal Services
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Barrier Placement • Pickup barriers from Four Hills Landfill . Contractor shall supply their own labor and equipment ( trucks , flatbed trailers , front end loader , etc .) for loading / unloading and hauling barrier between the landfill and downtown . Landfill to be accessed during times when the gate is open for DPW staff access ( weekdays 6 : 30 AM - 4 : 00 PM ) and coordinated in advance with the Superintendent of Solid Waste . • Set barriers in downtown at locations shown on a plan ( to be provided by the City ) and as directed by City staff . Contractor shall provide a rubber tire excavator , operator , and at least two laborers for placing / removing barrier . Coordinate with City Engineer to confirm exact locations and any adjustments . • Provide all required traffic control , to include a police officer detail and at least two flaggers . • Ensure installation meets safety standards ( visibility , stability , ADA compliance ). • Set barriers on April 30 , 2026 . Barrier Removal • Timely removal of barriers per City direction ( October 16 ). • Return barriers to Four Hills Landfill . |
Location
Country | United States of America (USA) |
State | New Hampshire |
Source
Source | New Hampshire Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Biomass, Waste Processing and Treatment |
Article published date | 2026-04-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Biomass tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Annual Repair of Steel FrontLoad Dumpsters and Rolloff Containers
- Solid Waste Industrial Waste Treatment Facility IWTF Intake Pump Station IPS PID 002423A Step 2
- Southeast Water Pollution Control Plant Biogas Utilization P...
- Oceanside Water Pollution Control Plant Digester Gas Utiliza...
- Yard Debris Processing Services Continuing Service
- Plumbing and Related Services Continuing Services
- Big Oak Flat Groveland Transfer Station Guardrail
