F--Or -Bear Valley Nwr -Fuel Reduction
Combined synopsis/solicitation · United States of America
Source: SAM.gov
Bear Valley NWR, OR - Fuels Reduction. Work is Hand Thinning/Piling Mixed-Conifer, Hand Thinning/Piling Mixed-Conifer and Brush, Juniper Seedling/Sapling Lop and Scatter, and Juniper Removal. See SOW attached. Vendor will submit a statement that the vendor understands the work and understands the environment and condition the work will be performed in and fill out the quote sheet on the first page
- Status
- Prospective
- Sector
- Water Supply and Storage, Chemical (Industrial), Manufacturing (Industrial), Government, Residential, Commercial
- Location
- United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about F--Or -Bear Valley Nwr -Fuel Reduction
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | combined synopsis/solicitation |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Bear Valley NWR, OR - Fuels Reduction. Work is Hand Thinning/Piling Mixed-Conifer, Hand Thinning/Piling Mixed-Conifer and Brush, Juniper Seedling/Sapling Lop and Scatter, and Juniper Removal. See SOW attached. Vendor will submit a statement that the vendor understands the work and understands the environment and condition the work will be performed in and fill out the quote sheet on the first page of the attachment. Send packets and questions to Robert_Sung@ios.doi.gov with "140F0S26Q0054 - Bear Valley" in the subject line RFI Items: Q1. Could the Government provide the specific calendar dates and restriction details for the wildlife Limited Operating Periods (LOPs) applicable to the Bear Valley NWR project area? A1. For areas within ½ mile of an active bald eagle nest, treatment will occur outside the nesting season of January 1 ¿ August 15. For areas designated as calving and fawning for mule deer and elk, treatment will not occur between May 15 ¿ July 15. Q2. The SOW requires hand thinning, piling, and covering piles with polyethylene material. Can the Government confirm that the contractor's responsibility ends once the piles are constructed and covered, and that the Government (USFWS) will perform the actual burning/disposal of the piles? A2. The contractor¿s responsibility ends once the piles are constructed and covered. The Government will be responsible for ensuring the piles are burned. Q3. How are the boundaries for the treatment units (CLINs 0001-0007) currently marked on the ground? Additionally, will the Government provide GIS shapefiles (.shp or .kml) of the project units to the awardee? A3. Treatment areas are not marked on the ground. The Government will supply a geo-referenced maps to the contractor. Q4. Under Industrial Fire Precaution Levels (IFPL) requirements, contractors must often maintain fire-fighting equipment and water on-site. Is there a designated water source available to the contractor within the Bear Valley NWR, or must the contractor haul all water from off-site locations? A4. The contractor will have to haul water from an off-site location. |
Original sector | Construction |
Location
Country | United States of America (USA) |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Chemical (Industrial), Manufacturing (Industrial), Government, Residential, Commercial |
Article published date | 2026-08-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
