Fcc Yazoo City - Air Cooled Condensors Replacement
Sector: Geothermal • Location: Yazoo City, Mississippi, United States of America
Source: SAM.gov
The primary objective of this project is to replace the aging and non-functioning geothermal system at the Federal Prison Camp (FPC) in Yazoo City, Mississippi (p. 1). The contractor will install a new system utilizing three air-cooled condensers to service approximately 15,500 square feet of the Camp Core and Education buildings, while capping and abandoning the original geothermal system in plac
- Status
- Prospective
- Sector
- Geothermal, Power Generation (CCGT), Steel, Education, Commercial, Residential, Manufacturing (Industrial), Cement
- Location
- Yazoo City, Mississippi, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Fcc Yazoo City - Air Cooled Condensors Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | combined synopsis/solicitation |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The primary objective of this project is to replace the aging and non-functioning geothermal system at the Federal Prison Camp (FPC) in Yazoo City, Mississippi (p. 1). The contractor will install a new system utilizing three air-cooled condensers to service approximately 15,500 square feet of the Camp Core and Education buildings, while capping and abandoning the original geothermal system in place (p. 1). Key Specifications & Requirements Equipment: High-efficiency, sickle-blade AC fan motors (e.g., ZIEHL-ABEGG) operating at 550 RPM, enclosed in 16-gauge galvanized steel casings (p. 1). Electrical & Sound: Systems must run on 460 main power and maintain a maximum sound pressure level of 46 dBA at 10 meters (p. 1). Pressure Testing: High heat transfer tube and fin coils must be factory leak-tested and sealed at 600 psig (p. 1). Contractor Duties: Pouring concrete equipment pads, core drilling walls, connecting and insulating refrigeration/electrical lines, factory startup, and providing all necessary tools and safety equipment (p. 2). Operational Rules & Constraints Work Hours: Monday through Friday, 7:30 am to 3:30 pm (excluding federal holidays), with a total project timeline not to exceed 150 calendar days (pp. 3-4). Security & Clothing: Workers must be escorted at all times (p. 3). Khaki, olive-green, camouflage, and sleeveless clothing are strictly prohibited (p. 3). Contraband: No electronic devices (cellphones, laptops, tablets), tobacco/vapor products, weapons, or unapproved medications are allowed on site (p. 3). Attached is the SOW. Site visit will be held 6/16/26 at 10 AM CST. Please contact B. Wiles @ bhwiles@bop.gov if interested no later than 6/12/26 12 Noon CST. |
Original sector | Construction |
Location
Country | United States of America (USA) |
State | Mississippi |
City | Yazoo City |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Geothermal, Power Generation (CCGT), Steel, Education, Commercial, Residential, Manufacturing (Industrial), Cement |
Article published date | 2026-06-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
