FCDO Accra British High Commission Offices Redevelopment, Ghana
The scope, dates and status of this tender. A free account opens every field.
Source: Find a Tender Service (UK)
Project Overview 1.1 The route to market being considered is the Competitive Flexible Procedure. This will comprise of a Request to Participate stage with Conditions of Participation questions and an Invitation to Tender stage. 1.2 The scope of the project is to redevelop two existing sites, to accommodate the British High Commission. The British High Commission (Ghana) estate is made up of two si
- Status
- Prospective
- Sector
- Road, Government, Residential, Commercial
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Find a Tender Service (UK)
ConstructChat
Ask ConstructChat about FCDO Accra British High Commission Offices Redevelopment, Ghana
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | planning |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Project Overview 1.1 The route to market being considered is the Competitive Flexible Procedure. This will comprise of a Request to Participate stage with Conditions of Participation questions and an Invitation to Tender stage. 1.2 The scope of the project is to redevelop two existing sites, to accommodate the British High Commission. The British High Commission (Ghana) estate is made up of two sites that sit side by side. It is located on Julius Nyerere Link Road in a reasonably affluent and central part of Accra, close to Parliament, the Presidency and some Ministries. The office estate in Accra is tired and in poor condition (in places), having suffered from a lack of strategic investment and maintenance. 1.3 It is anticipated that the consturction will take place in phases. Work will start at the Volta site which will be vacant throughout construction (staff normally based at this site will be temporarily moved to the Afadja Site). Once construction works at the Volta site are complete, all of the staff at the Afadja site will be transferred to the Volta site to enable the phase 2 works to be undertaken in the unoccupied Afadja building. 1.4 In line with the overall estate strategy, the intention is to have the Volta HC Office staff move to the Afadja High Commission for the duration of the Volta construction period. 1.5 The existing sites comprises of: • An existing split-site office building. It is proposed that the Volta building be retained and refurbished. • Existing plant structures to be demolished to make way for new extension. • Existing external landscaping to be demolished in some areas to make way for new cloister and walkway. 1.6 Part of the site development design includes: • Undertaking minor works to the existing Afadja site to make suitable to be used as a decant property whilst works to the Volta building are undertaken. • Refurbish the existing building to a fit-for-purpose, open plan office standard. • Replacement of existing mechanical and electrical installations. • Seismic strengthening and associated structural works. • External works to create shared internal and external spaces. 1.7 The Contractor, as well as any engaged sub-contractors, are required to perform all work in accordance with the relevant UK Standards. The construction must meet established UK standards throughout the build process. 2. It is anticipated that the works will be undertaken under the NEC form of contract; ECC 4, Option A (Priced Contract with an Activity Schedule). 3. The project team is also considering the inclusion of an Early Contractor Involvement stage ahead of the construction stage. Both stages will be within the same contract. 4. Some areas of the building will be classified as higher security and will require a separate specialist contractor. These works will not form part of this requirement/contract. However, the parameter and interface between the higher classified areas and the works within this requirement will require security cleared personnel at Security Check (SC*) level to manage the works. Contractor’s will need to be able to provide such personnel before the works contract can begin. *SC is a process of security vetting. Further details can be found at https://www.gov.uk/government/publications/united-kingdom-security-vetting-clearance-levels/national-security-vetting-clearance-levels#security-check-sc. 5. Below is a schedule of key market engagement and tendering activities (subject to change): Activity Date Submit PME questionnaire Response 23rd February 2026 1:1 Discussions with Bidders W/C 2nd March 2026 Issue PSQ Early November 2026 Issue ITT Late January 2027 Bidders day During ITT period Proposed Bid Deadline Late March 2027 Contract Award Mid-May 2027 |
Budget |
Location
Country | United Kingdom (UK) |
Source
Source | Find a Tender Service (UK) |
URL |
More Details
Record type | Tender |
Sector | Road, Government, Residential, Commercial |
Article published date | 2026-10-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United Kingdom
- 2024-01-05 09:00 - QBE129 Haverhill to Riverwalk School, Bury St Edmunds
- Tender for Play Area Works within the Borough of Ards and North Down
- OSPAR Relational Database for the implementation of Recommendations on the List of threatened and/or declining habitats and species
- QSB209, 0900 2024-01-04, Bury St Edmunds to Olive AP Academy, Stowmarket (4 seated vehicle)
- ID 6246207 - SEUPB - Information Services - Data Protection Officer Advisory Services
- T26-074CAP PEACEPLUS War Memorials Contractors Combined PQQ ITT Reissue
- 2026-05-07 09:00 - QBE393 Haverhill to Reboot Bury St Edmunds
- QIP066 09:00 2026-05-26 Shotley, Suffolk to Haughley Suffolk & Norwich Road, Ipswich, Suffolk
