FERC Fence and Concrete
Sector: Steel • Location: California, United States of America
Source: California Purchasing Group
The project includes the installation of a cattle fence separating the Field Education and Research Center from the open land . The project also requires a concrete pad to support a bronze topographic map . Scope of Work : The project includes installation of a cattle fence and new concrete pad to suppor
- Status
- Closed
- Sector
- Steel, Education, Rail, Car parking, Commercial, Cement, Automotive, Residential
- Location
- California, United States of America
- Updated
- 3 Nov 2026
- Source
- California Purchasing Group
ConstructChat
Ask ConstructChat about FERC Fence and Concrete
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The project includes the installation of a cattle fence separating the Field Education and Research Center from the open land . The project also requires a concrete pad to support a bronze topographic map . Scope of Work : The project includes installation of a cattle fence and new concrete pad to support the bronze topographic map per drawings A . Base work includes : a . Contractor shall provide all materials , equipment & labor to perform the Work outlined in the drawings . Contractor shall have a B license . b . Cattle fence shall be steel pipe fence with 2 3 / 8 ” line post and top rail . 3 / 8 ” cables shall be attached to the posts , 5 cables total . c . Fence shall include 20 foot sliding gate and 8 foot swing gate . Both gates must be able to be padlocked . d . Contractor shall provide a shop drawing and product data of fence material for University approval showing gate locations and exact fence location prior to installation . University has 18 calendar days to review and approve the submittal . University has 14 calendar days to respond to any RFIs post - award . e . Contractor is responsible for providing a safety plan for University approval prior to work . f . Before commencing work , Contractor shall submit a schedule of proposed operations for University ’ s approval identifying material submittals , University review of each submittal , delivery lead times and construction activities . g . B . Alternate 1 Work includes : a . Contractor shall provide a 20 foot double swing gate instead of 20 foot sliding gate . b . University reserves the right to accept this Alternate within 30 calendars after the date University signs the agreement c . No extension of time will be granted if this alternate is accepted . C . Contractor is responsible for : 1 . Contractor is responsible for attending environmental training before any on - site work can commence . Contractor is responsible for ensuring all subcontractors also attend environmental training . Environmental training will be provided by the University ’ s Designated Biologist . 2 . Contractor is responsible for protecting all spaces including protection over contents to prevent debris from entering area . Contractor is responsible for cleaning all debris caused by work . 3 . Contractor shall take all necessary precaution to ensure the safety of University Staff , Students , Faculty and Visitors at all times . 4 . Contractor shall maintain access for Cattle Rancher per University direction . 5 . Lifting , staging , storage , and transportation , of own personnel , materials and equipment 6 . Contractor will be responsible for providing on - site Portable Toilets and Sanitary Wash Stations . 7 . No eating inside of buildings – eat only in designated lunch areas . Provide cleanup of all food waste and trash immediately after eating . 8 . No AM / FM radios , CD players , iPods , MP3 players , iPhones , head phones or ear buds of any type , etc ., on site . 9 . Contractor shall control the conduct of its employees and those of its subcontractors and suppliers so as to prevent interaction initiated by said employees with University of California Merced students , staff , or other individuals ( except those associated with the Project ), on or adjacent to the Project site . Without limitation , unwanted interaction by those employees including whistling at , motioning toward , or initiating conversations with passerby . In the event that any employee initiates such unwanted interaction , or utilizes profanity , Contractor shall , either upon request of University ’ s Representative or on its own initiative , replace said employee with another of equivalent technical skill , at no additional cost to the University . 10 . Contractors must pay for own parking . Parking permits may be purchased from the Transportation and Parking Services ’ ( TAPS ) office at 209 - 228 - 8277 . 11 . Task lighting for own work |
Location
Country | United States of America (USA) |
State | California |
Source
Source | California Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Steel, Education, Rail, Car parking, Commercial, Cement, Automotive, Residential |
Article published date | 2026-05-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Steel tenders in United States of America
- Construction Materials Testing and Inspection Services for Thousand Oaks Boulevard Pedestrian Crossing CI 5398
- Street Construction Materials
- Jail Courthouse Walkway Project
- RFP 887702021MF Rapid Response Fire Boat for Norfolk FireRescue
- Millbrae Warehouse Loading Dock Repair
- Biosolids Digester Facilities - Southeast Treatment Plant T-...
- Marin Street Sewer Replacement - BID TABULATION
- Southeast Water Pollution Control Plant HVAC and Mechanical ...
