logo

FERC Fence and Concrete

Sector: Steel • Location: California, United States of America

Source: California Purchasing Group

Tender
Closed

The project includes the installation of a cattle fence separating the Field Education and Research Center from the open land . The project also requires a concrete pad to support a bronze topographic map . Scope of Work : The project includes installation of a cattle fence and new concrete pad to suppor

Status
Closed
Sector
Steel, Education, Rail, Car parking, Commercial, Cement, Automotive, Residential
Location
California, United States of America
Updated
3 Nov 2026
Source
California Purchasing Group

ConstructChat

Ask ConstructChat about FERC Fence and Concrete

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “FERC Fence and Concrete” is a tender record in Taiyo, linked to the Steel sector. It is issued for works, goods, or services related to California, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The project includes the installation of a cattle fence separating the Field Education and Research Center from the open land . The project also requires a concrete pad to support a bronze topographic map . Scope of Work : The project includes installation of a cattle fence and new concrete pad to support the bronze topographic map per drawings A . Base work includes : a . Contractor shall provide all materials , equipment & labor to perform the Work outlined in the drawings . Contractor shall have a B license . b . Cattle fence shall be steel pipe fence with 2 3 / 8 ” line post and top rail . 3 / 8 ” cables shall be attached to the posts , 5 cables total . c . Fence shall include 20 foot sliding gate and 8 foot swing gate . Both gates must be able to be padlocked . d . Contractor shall provide a shop drawing and product data of fence material for University approval showing gate locations and exact fence location prior to installation . University has 18 calendar days to review and approve the submittal . University has 14 calendar days to respond to any RFIs post - award . e . Contractor is responsible for providing a safety plan for University approval prior to work . f . Before commencing work , Contractor shall submit a schedule of proposed operations for University ’ s approval identifying material submittals , University review of each submittal , delivery lead times and construction activities . g . B . Alternate 1 Work includes : a . Contractor shall provide a 20 foot double swing gate instead of 20 foot sliding gate . b . University reserves the right to accept this Alternate within 30 calendars after the date University signs the agreement c . No extension of time will be granted if this alternate is accepted . C . Contractor is responsible for : 1 . Contractor is responsible for attending environmental training before any on - site work can commence . Contractor is responsible for ensuring all subcontractors also attend environmental training . Environmental training will be provided by the University ’ s Designated Biologist . 2 . Contractor is responsible for protecting all spaces including protection over contents to prevent debris from entering area . Contractor is responsible for cleaning all debris caused by work . 3 . Contractor shall take all necessary precaution to ensure the safety of University Staff , Students , Faculty and Visitors at all times . 4 . Contractor shall maintain access for Cattle Rancher per University direction . 5 . Lifting , staging , storage , and transportation , of own personnel , materials and equipment 6 . Contractor will be responsible for providing on - site Portable Toilets and Sanitary Wash Stations . 7 . No eating inside of buildings – eat only in designated lunch areas . Provide cleanup of all food waste and trash immediately after eating . 8 . No AM / FM radios , CD players , iPods , MP3 players , iPhones , head phones or ear buds of any type , etc ., on site . 9 . Contractor shall control the conduct of its employees and those of its subcontractors and suppliers so as to prevent interaction initiated by said employees with University of California Merced students , staff , or other individuals ( except those associated with the Project ), on or adjacent to the Project site . Without limitation , unwanted interaction by those employees including whistling at , motioning toward , or initiating conversations with passerby . In the event that any employee initiates such unwanted interaction , or utilizes profanity , Contractor shall , either upon request of University ’ s Representative or on its own initiative , replace said employee with another of equivalent technical skill , at no additional cost to the University . 10 . Contractors must pay for own parking . Parking permits may be purchased from the Transportation and Parking Services ’ ( TAPS ) office at 209 - 228 - 8277 . 11 . Task lighting for own work

Location

Country

United States of America (USA)

State

California

Source

Source

California Purchasing Group

URL

More Details

Record type

Tender

Sector

Steel, Education, Rail, Car parking, Commercial, Cement, Automotive, Residential

Article published date

2026-05-10

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender