Fiber Optic Measurement System
Sector: Broadband • Location: Beaufort, South Carolina, United States of America
Source: SAM.gov
Posting was updated on November 5, 2025 to add Amendment 0002, Conformed Synopsis-Solicitation, and Q&A document. *** Posting was updated on October 27, 2025 to add Q&A document. *** Posting was updated on October 22, 2025 to add Amendment 0001, see updated personnel listed in Section G for submission. *** Posting was updated on October 16, 2025 to add Q&A document. *** Posting was updated on Octo
- Status
- Closed
- Sector
- Broadband, Manufacturing (Industrial), Aerospace & Defense, Telecommunications, Power Generation (CCGT), Government, Residential, Commercial
- Location
- Beaufort, South Carolina, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Fiber Optic Measurement System
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Posting was updated on November 5, 2025 to add Amendment 0002, Conformed Synopsis-Solicitation, and Q&A document. *** Posting was updated on October 27, 2025 to add Q&A document. *** Posting was updated on October 22, 2025 to add Amendment 0001, see updated personnel listed in Section G for submission. *** Posting was updated on October 16, 2025 to add Q&A document. *** Posting was updated on October 7, 2025 to add Q&A document. *** This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2025-03, January 17, 2025. The provision at 52.212-3 and the clauses at 52.212-4, 52.212-5 apply to this acquisition; no addenda are attached. This is an all-or-none requirement and partial proposals will be deemed unresponsive and will not be evaluated. The Government will award on a single purchase order to the responsible Offeror whose offer conforms to the requirements as stated in the Solicitation and is most advantageous to the Government based on the criteria listed in section L and section M of the Solicitation. All responsible sources may submit a proposal which, if timely received, will be considered by the Agency. Proposals are due no later than the response date in the posting. Responses/offers shall be submitted electronically, PDF or MS Word Format to the email address in the posting. Any amendment(s) issued to this Request for Proposal (RFP) will be published on this website. Therefore, it is the Offerors responsibility to visit this website frequently for updates on this procurement. No telephone requests. |
Original sector | Not Identified |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Beaufort |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Broadband, Manufacturing (Industrial), Aerospace & Defense, Telecommunications, Power Generation (CCGT), Government, Residential, Commercial |
Article published date | 2025-11-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Broadband tenders in United States of America
- Geary Blvd. Sewer and Water Improvements
- Broadband Partnership
- Construction Manager Risk CMAR East Park P0625
- Web Content Management System Replacement
- Bay Corridor Transmission and Distribution - Phase 3 (2019) ...
- Design-Build Services for San Joaquin Valley Communication S...
- CANCELLED - Alameda Creek Recapture - Barge System Supplier ... Cost:
- 40 Gigabits per Second Collocation Switch Between VTA and Internet Service Provider Internet Point of Presence
