Fire Alarm And Suppression System Repair
Sector: Energy Storage • Location: Fresno, California, United States of America
Source: SAM.gov
The 144th Fighter Wing (144 FW), intends to issue a sole-source award for repair services to fire alarm and suppression systems. These repairs are required to restore fire systems in multiple buildings throughout the installation back to fully operational. The 144 FW intends to issue a sole-source award to HCI Systems, Inc. HCI recently completed the required NFPA 72, NFPA 25, and UFC 3?600?01 ins
- Status
- Closed
- Sector
- Energy Storage, Aerospace & Defense, Government, Commercial, Residential
- Location
- Fresno, California, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Fire Alarm And Suppression System Repair
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | sources sought |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The 144th Fighter Wing (144 FW), intends to issue a sole-source award for repair services to fire alarm and suppression systems. These repairs are required to restore fire systems in multiple buildings throughout the installation back to fully operational. The 144 FW intends to issue a sole-source award to HCI Systems, Inc. HCI recently completed the required NFPA 72, NFPA 25, and UFC 3?600?01 inspections of the fire alarm, fire pump, and fire sprinkler systems across Fresno Air National Guard Base. The inspections identified multiple critical deficiencies requiring immediate corrective action, including maintenance of three electric fire pumps, replacement of twenty?six outdated sprinkler gauges, installation of missing escutcheons, calc plates, PIV locks, FDC caps, and new fire alarm batteries across numerous buildings. Additional deficiencies include Monaco fire alarm programming corrections, device label updates, and extensive troubleshooting for non?reporting and non?functional alarm circuits in more than a dozen facilities. Because HCI performed the inspections, they possess the only complete and accurate diagnostic baseline for these issues, including system?specific knowledge of risers, pump isolation points, and proprietary Monaco Enterprises device configurations. Under NFPA 72 and NFPA 25, as well as standard fire?protection contractor liability and insurance requirements, any contractor performing repairs must independently verify system conditions prior to accepting responsibility. A new vendor cannot legally or ethically rely on the findings of another contractor, and would therefore be required to re?inspect, re?test, and re?diagnose all affected systems including the dormant fire pumps, sprinkler components, and Monaco Enterprises fire alarm network before any repair work could begin. This mandatory re?verification would duplicate work already completed by HCI, delay necessary NFPA?driven corrections, extend system impairments, and increase risk to mission?critical facilities. Several required corrective actions, particularly those involving Monaco Enterprises programming and troubleshooting, also require proprietary system access and specialized training not commonly held by alternate vendors. HCI already maintains this capability, along with full system familiarity, ensuring the repairs can be completed safely, efficiently, and within required regulatory timelines. For these reasons, HCI is the only responsible source capable of performing the needed repairs, and a sole source award is fully justified to protect life?safety systems, mission readiness, and government resources. This notice of intent is not a request for quote/proposal. Any interested party that believes it is capable of meeting the requirement described herein may identify themselves and must provide evidence of their capability to fulfill the requirement being requested by the closing date and time provided in this notice. Responses must be submitted in writing to the 144th Contracting Office at jarrod.sanchez@us.af.mil; justin.scales.1@us.af.mil. Telephone responses and requests will not be acknowledged. Any determination by the Government to not compete this requirement based on responses to this notice is solely within the discretion of the Government. Information received will be considered solely for the purpose of determining whether to conduct a competitive requirement. |
Original sector | Construction |
Location
Country | United States of America (USA) |
State | California |
City | Fresno |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Energy Storage, Aerospace & Defense, Government, Commercial, Residential |
Article published date | 2026-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Energy Storage tenders in United States of America
- HOUSEHOLD SINGLEUSE RECHARGEABLE BATTERY COLLECTION AND RECYCLING SERVICES
- BATTERIES FOR SURVEILLANCE EQUIPMENT
- Southeast Water Pollution Control Plant Power Feed and Prima...
- Flashlights and Batteries
- IFB 970302022LW Flashlights and Accessories
- Power Utility Rate Consulting Services for 2021 Electric Rates Study
- RFP - Portable Mass Spectrometer Device
- Southeast Water Pollution Control Plant Power Feed and Prima...
