Fire Alarm Sensitivity and Emergency Lighting Testing
Sector: Power Generation (CCGT) • Location: Pennsylvania, United States of America
Source: Pennsylvania Purchasing Group
1 . Verification of all remote annunciation functions 2 . Activation of all visual and audible signals to verify operations 3 . Check all accessible alarm initiating devices for proper operation , this will include , but not limited to : manual pull stations , ceiling and duct smoke detectors , heat detectors 4 . In
- Status
- Closed
- Sector
- Power Generation (CCGT)
- Location
- Pennsylvania, United States of America
- Updated
- 3 Nov 2026
- Source
- Pennsylvania Purchasing Group
ConstructChat
Ask ConstructChat about Fire Alarm Sensitivity and Emergency Lighting Testing
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | 1 . Verification of all remote annunciation functions 2 . Activation of all visual and audible signals to verify operations 3 . Check all accessible alarm initiating devices for proper operation , this will include , but not limited to : manual pull stations , ceiling and duct smoke detectors , heat detectors 4 . Inspect and test fire and smoke dampers are performed in accordance with Chapter 802 of the " City of Pittsburgh City Code ” 5 . Check all control equipment for proper voltages during trouble and alarm conditions 6 . Provide complete documentation of the entire test and an itemized list of all alarm devices tested and problems found 7 . Test shall be performed by fire alarm technician in accordance with NFPA - 72 and all local and state codes 8 . Perform detector sensitivity testing and document as required 9 . HACP will provide a schedule for testing two weeks prior to the test 10 . HACP will provide proper access to any areas needed 11 . HACP will provide alarm parts 12 . All alarms at the selected locations below are to be tested 13 . All emergency lighting shall follow NFPA 101 Section 7 . 9 . 3 Emergency Lighting must be tested annually for a duration of 1 . 5 hours . ○ All emergency lighting must be fully operational throughout the duration of all testing 14 . Contractor must maintain complete records of all tests and inspections to be shared with HACP 15 . The Code refers to NFPA 110 testing for the testing of emergency generators and related transfer switches and NFPA III is for testing stored electrical energy systems that provide an alternate source of electrical power |
Location
Country | United States of America (USA) |
State | Pennsylvania |
Source
Source | Pennsylvania Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Power Generation (CCGT) |
Article published date | 2026-05-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
