logo

Fire Alarm System and Fire Suppression System Maintenance , Inspection , and Repair - Sacramento County

The scope, dates and status of this tender. A free account opens every field.

Source: California Purchasing Group

Tender
Closed

A . Inspection Procedures 1 ) Contractor shall work with Caltrans Contract Manager to set up a service schedule and shall schedule inspections at least two ( 2 ) weeks out for proper notification . 2 ) Contractor shall notify Caltrans Contract Manager when Contractor is on site to perform service inspections . 3 )

Status
Closed
Sector
Rail
Location
California, United States of America
Updated
3 Nov 2026
Source
California Purchasing Group

ConstructChat

Ask ConstructChat about Fire Alarm System and Fire Suppression System Maintenance , Inspection , and Repair - Sacramento County

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Fire Alarm System and Fire Suppression System Maintenance , Inspection , and Repair - Sacramento County” is a tender record in Taiyo, linked to the Rail sector. It is issued for works, goods, or services related to California, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

A . Inspection Procedures 1 ) Contractor shall work with Caltrans Contract Manager to set up a service schedule and shall schedule inspections at least two ( 2 ) weeks out for proper notification . 2 ) Contractor shall notify Caltrans Contract Manager when Contractor is on site to perform service inspections . 3 ) Contractor shall contact the local Fire Station prior to conducting any system function testing . 4 ) Contractor shall inspect each system for installation integrity , both electrical and mechanical . 5 ) Contractor shall ensure that a clear access exists to all devices , and equipment is maintained so that nothing may hinder operation of any device . B . Contractor shall train Caltrans Contract Manager on system operations if requested by Caltrans Contract Manager . C . Contractor shall submit a list of testing results to Caltrans Contract Manager within five ( 5 ) working days after completion of any inspections , preventative maintenance , and tests . D . Contractor shall submit to Caltrans Contract Manager an itemized invoice of services completed and any recommendations for safety updates and / or repairs needed . Contractor shall identify the cost of any parts / materials / supplies / fees / permits required to complete recommended safety updates and / or repairs . The cost of any parts / materials / supplies / fees / permits for routine and non - routine repairs required shall be in accordance with Attachment 1 , Bid Proposal , Item Number 9 , and Exhibit A , Item 15 . E . Repairs that require parts to be ordered shall have prior written approval from Caltrans Contract Manager and shall be in accordance with Attachment 1 , Bid Proposal , Item Number 9 , and Exhibit A , Item 15 .

Location

Country

United States of America (USA)

State

California

Source

Source

California Purchasing Group

URL

More Details

Record type

Tender

Sector

Rail

Article published date

2026-05-10

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender