logo

Fire Hydrant Assessment Program

Sector: Manufacturing (Industrial) • Location: Tennessee, United States of America

Source: Tennessee Purchasing Group

Tender
Closed

1 . The final Scope of Work may be modified and will become a part of any contract or agreement between the City and the selected Contractor . 2 . Hydrant Operation / Data Collection – Using City records , field locate all public fire hydrants and perform the following tasks : a . Collect a coordinate point

Status
Closed
Sector
Manufacturing (Industrial)
Location
Tennessee, United States of America
Updated
3 Nov 2026
Source
Tennessee Purchasing Group

ConstructChat

Ask ConstructChat about Fire Hydrant Assessment Program

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Fire Hydrant Assessment Program” is a tender record in Taiyo, linked to the Manufacturing (Industrial) sector. It is issued for works, goods, or services related to Tennessee, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

1 . The final Scope of Work may be modified and will become a part of any contract or agreement between the City and the selected Contractor . 2 . Hydrant Operation / Data Collection – Using City records , field locate all public fire hydrants and perform the following tasks : a . Collect a coordinate point with sub - meter accuracy with an approved GPS . b . Check fire hydrant nozzle height for correct ground clearance . c . Identify the manufacturer , year of manufacture , and barrel size . d . Lubricate operating nut ( if appropriate for hydrant make / model ) with noncorrosive , FDA - approved lubricant . e . Remove all outlet nozzle caps , clean the threads , and lubricate with noncorrosive FDA - approved lubricant , ensuring ease of operation . f . Open the hydrant with the nozzle caps in place to check for weep hole leakage . g . Verify that the hydrant main ( bottom ) valve completely shuts and that the hydrant drains . h . Flow hydrant to maximum rate , record static pressure , pitot pressure and calculate flow rate and gallons flushed ( The use of a calibrated combination pitot gauge and hydrant diffuser is required for all hydrant flushing ). i . Check outlet nozzle chains for free action on each cap . If the chains bind , open the loop end around the cap until they move freely . j . Photograph the hydrant ( perspective and close - up of pertinent identification markings ). k . Document any minor operational deficiencies and / or miscellaneous findings . 3 . Non - operational hydrants will be reported to the City immediately . 4 . Hydrant Maintenance – to include the following items completed by the Contractor : a . Repair / Replace galled / non - functional hose nozzle connections and caps with materials furnished by the City . b . Replace / Repair missing or damaged hose nozzle cap chains .

Location

Country

United States of America (USA)

State

Tennessee

Source

Source

Tennessee Purchasing Group

URL

More Details

Record type

Tender

Sector

Manufacturing (Industrial)

Article published date

2026-05-15

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender