Fire Hydrants
Sector: Oil and Gas • Location: Connecticut, United States of America
Source: Connecticut Purchasing Group
The City of New Britain is soliciting bids for 50 Mueller A423 super centurion 250 dry barrel fire hydrants with bases per the following specifications . No Substitutions will be allowed . The number of hydrants purchased under this bid may not be 50 . The City reserves the right to order less than o
- Status
- Closed
- Sector
- Oil and Gas, Water Supply and Storage, Manufacturing (Industrial)
- Location
- Connecticut, United States of America
- Updated
- 3 Nov 2026
- Source
- Connecticut Purchasing Group
ConstructChat
Ask ConstructChat about Fire Hydrants
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The City of New Britain is soliciting bids for 50 Mueller A423 super centurion 250 dry barrel fire hydrants with bases per the following specifications . No Substitutions will be allowed . The number of hydrants purchased under this bid may not be 50 . The City reserves the right to order less than or more than 50 . Hydrants will be ordered on an “ as - needed ” basis . 1 . Hydrants shall be designed , manufactured , and tested in compliance with the latest revision of AWWA C - 502 " STANDARD FOR DRY BARREL HYDRANTS " as published by the American Waterworks Association . 2 . Hydrants shall be " Traffic " type , with a replaceable " breakable " unit immediately above the ground line for minimizing repairs due to traffic damage . Depth of bury shall be 5 1 / 2 feet . 3 . Hydrants shall be of the compression type , constructed such that the main valve closes with the water pressure to assure no loss of water in the event of damage to the upper portion of the hydrant . 4 . The main valve shall have a minimum diameter of 5 1 / 4 ", to assure optimum flow . 5 . Hydrant shall be of the dry top design with " O " ring seals to insure that the operating threads will be protected from water entry . Dry top design is to include a factory lubricated operating mechanism , which allows supplemental lubricant to be added in the field without removal of the top section . Standard lubricant shall be oil , suitable for a temperature range of - 60 to + 150 degrees Fahrenheit , and shall incorporate a system of forced lubrication of the thrust collar area each time the hydrant is operated . |
Location
Country | United States of America (USA) |
State | Connecticut |
Source
Source | Connecticut Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Oil and Gas, Water Supply and Storage, Manufacturing (Industrial) |
Article published date | 2026-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Oil and Gas tenders in United States of America
- Road Material and Hauling Services
- Used Gasoline Collection Transport Recycling Service
- Town Wide Energy Resilience Master Plan
- ANTIFREEZE OILS AND LUBRICANTS
- Road Material and Hauling Services UPDATED
- Southeast Water Pollution Control Plant Biosolids Digester F...
- Sunol Long Term Improvements Alameda Creek Watershed Center
- City Distribution Division Fueling Station - BID TABULATION
