logo

Fire Pump and Sprinkler Inspections , Maintenance , and Repair

The scope, dates and status of this tender. A free account opens every field.

Source: North Carolina Purchasing Group

Tender
Closed

A . WET SPRINKLER SYSTEMS 1 . The Vendor shall provide the labor and expertise to test and inspect all of the components of the sprinkler systems as per NFPA25 - 2014 Version . 2 . Control Valves : Tampered control valves are to be tested and inspected . All tampers to be tested by closing and opening of

Status
Closed
Sector
Water Supply and Storage
Location
North Carolina, United States of America
Updated
3 Nov 2026
Source
North Carolina Purchasing Group

ConstructChat

Ask ConstructChat about Fire Pump and Sprinkler Inspections , Maintenance , and Repair

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Fire Pump and Sprinkler Inspections , Maintenance , and Repair” is a tender record in Taiyo, linked to the Water Supply and Storage sector. It is issued for works, goods, or services related to North Carolina, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

A . WET SPRINKLER SYSTEMS 1 . The Vendor shall provide the labor and expertise to test and inspect all of the components of the sprinkler systems as per NFPA25 - 2014 Version . 2 . Control Valves : Tampered control valves are to be tested and inspected . All tampers to be tested by closing and opening of valve . Valve shall be operated for the full range of the valve 3 . Flow Switches : The Vendor shall test the timing accuracy of all flow switches by flowing water at the Test on floor control and record each for future reference . Copy of the report shall be included in the test documentation 4 . Dry Valve : The annual trip test should be scheduled at the same time as the fire pump flow test . Test results should be posted at the valve and included in the quarterly report . The air leakage test should be done at the same time . 5 . Fire Pump Flow Tests : The annual flow test of the fire pumps should be scheduled during the June inspection . It shall be the responsibility of the Vendor to assure that the results of these flow test is in the quarterly report for June . Other quarterly reports should have the Fire Pump testing included also . It will be the Vendors responsibility to flow water in a manner such as to not impose on the daily functions of the facility where work is performed . Venturi Meter are NOT to be used . 6 . Post Indicator Valves : The P . I . V . shall be exercised to confirm proper operation . ( Full extension required ) 7 . Fire Department Connections : All fire department connections shall be tested per NFPA25 and included on reports . 8 . All stand pipes will be tested per NFPA25 . B . DRY SYSTEMS 1 . Dry Systems shall be inspected and tested for proper function per NFPA25 requirements . One annual trip test shall be required to be conducted , however ; the test shall not be conducted during freezing conditions . 2 . Air leakage test should be done at the same time as the trip test . 3 . Pre - Action Systems : The annual trip test should be scheduled at the same time as the annual fire pump flow test . Test results on the pre - action systems should be posted at the System and included in the quarterly report .

Location

Country

United States of America (USA)

State

North Carolina

Source

Source

North Carolina Purchasing Group

URL

More Details

Record type

Tender

Sector

Water Supply and Storage

Article published date

2026-05-05

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender