Fire Station # 3 Post Remediation Reconstruction and Restroom Build Out
Location: Missouri, United States of America
Source: Missouri Purchasing Group
The following Scope of Work outlines all construction , restoration , and facility improvement tasks required to complete the post - remediation reconstruction project at Fire Station # 3 . Contractors must provide all labor , materials , equipment , tools , and expertise needed to complete the tasks described , ensuring the
- Status
- Closed
- Location
- Missouri, United States of America
- Updated
- 3 Nov 2026
- Source
- Missouri Purchasing Group
ConstructChat
Ask ConstructChat about Fire Station # 3 Post Remediation Reconstruction and Restroom Build Out
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The following Scope of Work outlines all construction , restoration , and facility improvement tasks required to complete the post - remediation reconstruction project at Fire Station # 3 . Contractors must provide all labor , materials , equipment , tools , and expertise needed to complete the tasks described , ensuring the station is returned to a safe , functional , and operational condition . The detailed scope below identifies each area of the facility requiring work and the specific improvements to be performed . A . Southwest Bunk Room • Install R - 13 insulation in wall • Install 5 / 8 " drywall on ceiling and walls • Prep , finish , and paint walls • Install carpet squares • Install cove molding • Reinstall ceiling lights B . Northwest Bunk Room • Install carpet squares C . Upstairs Storage Area , Mechanical Room , Landing , and Hallway • Install R - 13 insulation in walls • Install 5 / 8 " drywall on walls • Prep , finish , and paint • Install cove molding D . Stairwell Wall • Install framing for stairwell • Install 5 / 8 " drywall on interior walls ( new framing only ) • Install 5 / 8 " drywall on exterior wall • Install R - 13 insulation • Install cove molding • Move exit entry door : uninstall existing hallway door and reinstall into new stairwell wall exiting to bay area E . Upstairs Restroom Build - Out • Frame new restroom walls • Install 5 / 8 " drywall • Prep , finish , and paint walls • Install two fire - rated doors • Install single - bowl vanity • Install toilet ... |
Location
Country | United States of America (USA) |
State | Missouri |
Source
Source | Missouri Purchasing Group |
URL |
More Details
Record type | Tender |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More infrastructure tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Veteran Transportation
- Countywide Vending Machine Services with Healthy Options
- Temporary Staffing Services Local and National
- NEW TIRES RETREADS AND TIRE SERVICES
- Youth Suicide Prevention Programming
