logo

Fire Suppression and Kitchen Hood Cleaning

Closed · Kansas · Last reported Jan 2026

Source: Kansas Purchasing Group

Tender
Closed

Scope of work to include but not limited to the following : • Production Engineering • Installation • Repair • Delivery • Hood Cleaning • Kitchen Exhaust Systems • Hood Filters • Kitchen Fire Suppression Systems • Commercial Kitchen Cleaning Supplies • Associated components and supports for all the above • Semi - annual

Status
Closed
Sector
Metal, Commercial
Location
Kansas, United States of America
Updated
3 Nov 2026
Source
Kansas Purchasing Group

ConstructChat

Ask ConstructChat about Fire Suppression and Kitchen Hood Cleaning

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Fire Suppression and Kitchen Hood Cleaning” is a tender record in Taiyo, linked to the Metal sector. It is issued for works, goods, or services related to Kansas, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

Scope of work to include but not limited to the following : • Production Engineering • Installation • Repair • Delivery • Hood Cleaning • Kitchen Exhaust Systems • Hood Filters • Kitchen Fire Suppression Systems • Commercial Kitchen Cleaning Supplies • Associated components and supports for all the above • Semi - annual inspections conducted on Kitchen Hood Fire Suppression Systems • Check to make sure any corrections from the previous inspection were made . • Nozzles from which the extinguishing agent is discharged will be inspected for build - up and serviced as necessary . • Nozzle caps replacement . • Air is run through the extinguishing lines to make sure there is no blockage . • The manual pull station is pulled to make sure it activates the system . • Pressure gauges are checked for proper PSI . • Operation of gas shut off valve and micro - switch are tested . • Fans are running and checked to see if they are operating properly . • Fusible links will be cut ( simulating the melting of the metal due to excessive heat ) to see if the system activates . • New links are installed with the date stamped on them for proof of service for the fire inspection . • Check that gas shuts off upon activation . • Test that the electrical shuts off upon activation . • Perform any other tasks not listed but are required per NFPA 17 . • File your inspection certification with the local fire authority . • Tag the system showing certification was completed by a professional contractor according to regulations . • A copy of the Inspection Report will be left with the POC at each facility and one will be sent to the local fire department .

Location

Country

United States of America (USA)

State

Kansas

Source

Source

Kansas Purchasing Group

URL

More Details

Record type

Tender

Sector

Metal, Commercial

Article published date

2026-04-08

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender