logo

First Foods Meat Processing Plant Construction Manager At - Risk Omak WA

Location: Washington, United States of America

Source: Washington Purchasing Group

Tender
Closed

The Firm will be responsible for providing CMAR services related to the preconstruction and construction phases of the Project as identified , but not limited to , the following : Preconstruction Activities : . 1 Staffing : The Firm shall provide the proper number of qualified staff members as necessary to competen

Status
Closed
Location
Washington, United States of America
Updated
3 Nov 2026
Source
Washington Purchasing Group

ConstructChat

Ask ConstructChat about First Foods Meat Processing Plant Construction Manager At - Risk Omak WA

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “First Foods Meat Processing Plant Construction Manager At - Risk Omak WA” is a tender record in Taiyo. It is issued for works, goods, or services related to Washington, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The Firm will be responsible for providing CMAR services related to the preconstruction and construction phases of the Project as identified , but not limited to , the following : Preconstruction Activities : . 1 Staffing : The Firm shall provide the proper number of qualified staff members as necessary to competently and fully manage all Pre - Construction services . . 2 Budgeting : The Firm must work with the Project Team to develop detailed Project Budgets at the completion of each design phase . This initial budget shall include sufficient identification and clarification as to the Scope - of - Work included and specifically excluded by the Firm . Once approved , the budget shall be regularly updated at each stage , and presented for approval , as the design continues to develop . The level of detail presented in each budget update shall continue to increase as the design progresses from the initial conceptual and programming phase through final 100 % contract documents and a final GMP . Estimates should include quantities and unit prices for each item of work where applicable . . 3 Value Engineering / Constructability Reviews : The Firm must provide constructability and value engineering reviews in conjunction with above budgets . The Firm should review all existing studies and plans to determine their viability and propose adjustments using the current market and site information gathered by the Project Team , if needed . . 4 Identification of Any Necessary Design - Assist ( or possibly Design - Build ) Trades : Upon thorough evaluation of the project scope , anticipated design services scheduled to be provided by the Design Team , and other key factors such as the project schedule , the Firm may provide recommendations for any Design - Assist or Design - Build trades that are necessary in order to best maintain the project budget , schedule , and overall quality product .

Location

Country

United States of America (USA)

State

Washington

Source

Source

Washington Purchasing Group

URL

More Details

Record type

Tender

Article published date

2026-05-01

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender