Fishers Peak State Park - NEW Park Construction Phase 1 SEFP
Bids closed Apr 2026 · Rocky Mountain E-Purchasing System · Last reported Mar 2026
Source: Rocky Mountain E-Purchasing System
This report presents the results of our Subgrade Investigation and Pavement Design , and Preliminary Geotechnical Investigation for the proposed improvements including access roadways , campgrounds , and a visitor ’ s center for Fishers Peak State Park located south of Trinidad , Colorado ( Fig . 1 ). The purpose of the
- Status
- Closed
- Sector
- Commercial, Road
- Location
- Rocky Mountain E-Purchasing System, United States of America
- Updated
- 3 Nov 2026
- Source
- Rocky Mountain E-Purchasing System
ConstructChat
Ask ConstructChat about Fishers Peak State Park - NEW Park Construction Phase 1 SEFP
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | This report presents the results of our Subgrade Investigation and Pavement Design , and Preliminary Geotechnical Investigation for the proposed improvements including access roadways , campgrounds , and a visitor ’ s center for Fishers Peak State Park located south of Trinidad , Colorado ( Fig . 1 ). The purpose of the investigation was to provide an indication of the subsurface conditions for design of access roads and for planning purposes regarding placement and foundation types for future structures . The scope was described in our Proposal No . SC - 22 - 0052R2 , dated revised October 7 , 2022 . This report was prepared from data developed during field exploration , laboratory testing , review of previous investigations in the area , engineering analysis , and experience with similar conditions . The report includes a description of subsoil and bedrock conditions found in our exploratory borings and discussions of site development and construction as influenced by geotechnical considerations . When site plans and grading are finalized , a design level geotechnical investigation should be performed to develop site specific design criteria and construction details for retaining walls , foundations , floor systems , slabson - grade , and lateral earth loads , as well as drainage precautions . A brief summary of our conclusions and recommendations follows , with more detailed information in the report . |
Location
Country | United States of America (USA) |
State | Rocky Mountain E-Purchasing System |
Source
Source | Rocky Mountain E-Purchasing System |
URL |
More Details
Record type | Tender |
Sector | Commercial, Road |
Article published date | 2026-05-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Commercial tenders in United States of America
- Sanitary Sewer Lateral Lining Pilot Program Section 230067500SA
- Trophies Plaques Awards ETC
- Painting Services for Building Exteriors Infrastructure Systems and Pressure Washing
- OAM Learning Management System
- CYBER SECURITY PENETRATION TESTING
- PROMOTIONAL ITEMS SOUVENIRS
- Proposed Services at Former Ingleside Recreation Center
- Towing Services CityOwned Vehicles Light and Heavy Duty
