Fishing Pier Rebuild
The scope, dates and status of this tender. A free account opens every field.
Source: Arkansas Purchasing Group
For Re - Skinning T - Shape Deck and Handrails The Contractor shall furnish all labor , materials , tools , equipment , supervision , transportation , and incidentals necessary to complete the entire Scope of Work that follows : 1 . Prospective contractor shall perform the removal of existing decking and handrails . And the
- Status
- Closed
- Sector
- Cement, Wind, Hotel
- Location
- Arkansas, United States of America
- Updated
- 3 Nov 2026
- Source
- Arkansas Purchasing Group
ConstructChat
Ask ConstructChat about Fishing Pier Rebuild
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | For Re - Skinning T - Shape Deck and Handrails The Contractor shall furnish all labor , materials , tools , equipment , supervision , transportation , and incidentals necessary to complete the entire Scope of Work that follows : 1 . Prospective contractor shall perform the removal of existing decking and handrails . And the removal of all debris from project site . 2 . Prospective contractor shall furnish material and labor , equipment , and tools to re - skin deck , handrails , and ADA handrails . 3 . Prospective contractor shall construct all construction safety barriers to keep bystanders out of work areas and at a safe distance for duration of project . 4 . Prospective contractor shall prevent any unnecessary damage to any landscaping . 5 . Prospective contractor shall be responsible for removal of all debris including screws , metals , all disposable materials offsite at the end of each workday . 6 . Prospective contractor shall work during normal park business hours . 7 . All work must be scheduled with park officials . 8 . Prospective contractor shall provide ( 1 ) year warranty that applies to all work performed . 9 . Prospective contractor shall replace any bad or rotten floor joist , or bands once the old decking is removed . 10 . Prospective contractor shall install new ACQ 2 ” x6 ” over existing floor joist . ( Apporx . 800 sq . ft .) 11 . All decking , handrails , and framing materials be treated ACQ and all fasteners to be galvanized . 12 . All framing shall be attached 3 ” galvanized screws made for ACQ . 13 . Prospective contractor shall apply a 2 ” inch joist shield on top of all the joists , bands , and stringers that will have the new 2 ” x6 ” boards sitting on . 14 . Prospective contractor shall replace the handrail caps ( Approx . 112 ’ lin . Ft .) and the 2 ” x4 ” rails attached on outside of post . ( Approx . 112 ’ lin . Ft .). The New 2 ” x6 ” ACQ cap at top of post shall have mitered joints . 15 . Note All 2 ” x6 ” deck boards shall have 3 screws per joist and 2 ” x4 ” rails shall have 2 screws per post . 16 . Prospective contractor shall make new concrete caps for top of the post for the missing ones and shall match existing . 17 . Prospective contractor shall perform the removal of existing Shingles and Felt on the pavilion roof . And the removal of debris from project site . 18 . Prospective contractor shall furnish all materials , tools and labor , equipment to install new drip edge and StormTread synthetic roofing underlayment or equivalent and a ( class 3 impact ) 60 - mph wind architectural shingles Approx . ( 300 ’ sq . ft .) of roof area . And Approx . ( 56 ’ lin . Ft . drip edge ) and Approx . ( 32 ’ lin . Ft . ridge cap ). 19 . The color of shingles shall best match existing ( Weatherwood ) and other roofs if close to the one that ’ s being replaced . 20 . Prospective contractor shall install a premium starter strip around the eaves and rakes to help prevent wind uplift . 21 . Prospective contractor shall nail the shingles with a minimum one inch in length and a minimum four nails per shingle . 22 . Prospective contractor shall furnish workmen ’ s comp . General liability insurances . 23 . Prospective contractor shall be responsible for all materials deliveries and protection of during construction . 24 . Park is not responsible for equipment and materials left on project site . 25 . All work shall be done with in ( 30 days ) from time of bid ending awarded . Exclusions material or weather delays . |
Location
Country | United States of America (USA) |
State | Arkansas |
Source
Source | Arkansas Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Cement, Wind, Hotel |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Cement tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Horsehaven Creek Culvert Replacement Project D230
- 23B49SR Marine Science Center Turtle Canopy
- Se Dixie Highway County Road A1A Utility Relocation Project
- PreQualification of Bidders for Chaboya Improvements
- 2022 Concrete Repairs Jackson Manor Subdivision
- SAC Building 10318 Exterior Paint
- Fire Station 32 ADA Restroom Improvements
