logo

Fishing Pier Rebuild

The scope, dates and status of this tender. A free account opens every field.

Source: Arkansas Purchasing Group

Tender
Closed

For Re - Skinning T - Shape Deck and Handrails The Contractor shall furnish all labor , materials , tools , equipment , supervision , transportation , and incidentals necessary to complete the entire Scope of Work that follows : 1 . Prospective contractor shall perform the removal of existing decking and handrails . And the

Status
Closed
Sector
Cement, Wind, Hotel
Location
Arkansas, United States of America
Updated
3 Nov 2026
Source
Arkansas Purchasing Group

ConstructChat

Ask ConstructChat about Fishing Pier Rebuild

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Fishing Pier Rebuild” is a tender record in Taiyo, linked to the Cement sector. It is issued for works, goods, or services related to Arkansas, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

For Re - Skinning T - Shape Deck and Handrails The Contractor shall furnish all labor , materials , tools , equipment , supervision , transportation , and incidentals necessary to complete the entire Scope of Work that follows : 1 . Prospective contractor shall perform the removal of existing decking and handrails . And the removal of all debris from project site . 2 . Prospective contractor shall furnish material and labor , equipment , and tools to re - skin deck , handrails , and ADA handrails . 3 . Prospective contractor shall construct all construction safety barriers to keep bystanders out of work areas and at a safe distance for duration of project . 4 . Prospective contractor shall prevent any unnecessary damage to any landscaping . 5 . Prospective contractor shall be responsible for removal of all debris including screws , metals , all disposable materials offsite at the end of each workday . 6 . Prospective contractor shall work during normal park business hours . 7 . All work must be scheduled with park officials . 8 . Prospective contractor shall provide ( 1 ) year warranty that applies to all work performed . 9 . Prospective contractor shall replace any bad or rotten floor joist , or bands once the old decking is removed . 10 . Prospective contractor shall install new ACQ 2 ” x6 ” over existing floor joist . ( Apporx . 800 sq . ft .) 11 . All decking , handrails , and framing materials be treated ACQ and all fasteners to be galvanized . 12 . All framing shall be attached 3 ” galvanized screws made for ACQ . 13 . Prospective contractor shall apply a 2 ” inch joist shield on top of all the joists , bands , and stringers that will have the new 2 ” x6 ” boards sitting on . 14 . Prospective contractor shall replace the handrail caps ( Approx . 112 ’ lin . Ft .) and the 2 ” x4 ” rails attached on outside of post . ( Approx . 112 ’ lin . Ft .). The New 2 ” x6 ” ACQ cap at top of post shall have mitered joints . 15 . Note All 2 ” x6 ” deck boards shall have 3 screws per joist and 2 ” x4 ” rails shall have 2 screws per post . 16 . Prospective contractor shall make new concrete caps for top of the post for the missing ones and shall match existing . 17 . Prospective contractor shall perform the removal of existing Shingles and Felt on the pavilion roof . And the removal of debris from project site . 18 . Prospective contractor shall furnish all materials , tools and labor , equipment to install new drip edge and StormTread synthetic roofing underlayment or equivalent and a ( class 3 impact ) 60 - mph wind architectural shingles Approx . ( 300 ’ sq . ft .) of roof area . And Approx . ( 56 ’ lin . Ft . drip edge ) and Approx . ( 32 ’ lin . Ft . ridge cap ). 19 . The color of shingles shall best match existing ( Weatherwood ) and other roofs if close to the one that ’ s being replaced . 20 . Prospective contractor shall install a premium starter strip around the eaves and rakes to help prevent wind uplift . 21 . Prospective contractor shall nail the shingles with a minimum one inch in length and a minimum four nails per shingle . 22 . Prospective contractor shall furnish workmen ’ s comp . General liability insurances . 23 . Prospective contractor shall be responsible for all materials deliveries and protection of during construction . 24 . Park is not responsible for equipment and materials left on project site . 25 . All work shall be done with in ( 30 days ) from time of bid ending awarded . Exclusions material or weather delays .

Location

Country

United States of America (USA)

State

Arkansas

Source

Source

Arkansas Purchasing Group

URL

More Details

Record type

Tender

Sector

Cement, Wind, Hotel

Article published date

2026-03-27

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender