Fixed Asset and Space Utilization Audit
Sector: Education • Location: Connecticut, United States of America
Source: Connecticut Purchasing Group
A school - by - school facility evaluation by inspection by the firm ’ s staff including architects , engineers , and consultants in order to determine the condition of the school facilities , including code compliance , deferred maintenance , potential hazards , and compliance with depreciation / replacement schedules for roofs
- Status
- Closed
- Sector
- Education, Commercial
- Location
- Connecticut, United States of America
- Updated
- 3 Nov 2026
- Source
- Connecticut Purchasing Group
ConstructChat
Ask ConstructChat about Fixed Asset and Space Utilization Audit
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | A school - by - school facility evaluation by inspection by the firm ’ s staff including architects , engineers , and consultants in order to determine the condition of the school facilities , including code compliance , deferred maintenance , potential hazards , and compliance with depreciation / replacement schedules for roofs , heating systems , ADA issues , and other facility issues . The consultant will make use of the previous facilities study , updating with projects completed and providing a plan for the district to use for the next ten years . 1 . An update of each facility ’ s physical condition including useful life of each building ’ s components such as , but not limited to the HVAC , plumbing , electrical , roofing , food service equipment , etc . 2 . A floor plan and a site plan of each building . 3 . Documentation of Code Violations or recommendations for improvement . 4 . ADA accessibility recommendations for improvement . 5 . Statement of energy efficiency and recommendations for improvement . 6 . Recommended schedule for replacement or repairs ( Schedule of priorities ). 7 . Estimated cost : To be generated for each identified deficiency . 8 . Information to be delivered in electronic form , such as Microsoft Excel , so that data can be sorted and grouped in various ways . Deliverables 1 : A written report of a school - by - school facility study of the physical condition and cost of repairs and code compliance , along with the prioritization of any needed repairs . Any scheduled replacement of large cost items including roofs , etc . over the next 10 - year period should also be part of this report . 1 . The consultant will work with the district ’ s demographer to incorporate the latest information available on district enrollment . 2 . Study of Capacity as it Relates to Enrollment Projections , Educational Programs , Community Use , and Impact on School Facilities Utilizing information provided by the Superintendent of Schools and The Connecticut State Department of Education and the district ’ s most recent enrollment projections , assess and analyze each building ’ s capacity to provide adequate programming for additional students in the forthcoming years and taking into consideration student enrollment and building capacity by neighborhoods . The report should consider any existing policies or recommendations for class sizes , appropriate grade level programming , and room / facility utilization . In consultation with the various town agencies , appropriate consideration should be given to the incorporation of the “ schools as a community resource center ” concept whereby some of the needs of the community might be served while we are meeting the educational needs of our students . The report should include any additional classroom space that will be required as well as additions to any core areas within each building . This report should also include any recommended reductions or consolidations based on population or possible cost savings and note any inequities between the schools regarding the physical plant . The report should provide options to expand existing facilities such as new construction , a cost analysis of each option as well as a time - frame associated with each option . Included in the cost estimates should be any code compliant issues |
Location
Country | United States of America (USA) |
State | Connecticut |
Source
Source | Connecticut Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Education, Commercial |
Article published date | 2026-03-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Education tenders in United States of America
- Sanitary Sewer Lateral Lining Pilot Program Section 230067500SA
- 23MISC11 Sign Language Interpreting Agency Services
- 21MISC11 Adaptive Equipment for Rock Creek School
- 23MISC15 Request for Qualifications of Photography Vendors
- 23CURR1 Music Equipment Supplies
- Bid 20C17 Waverley Elementary School New School Construction ReBid Contract Package 9D ResilientRubber Athletic Surfacing
- Living Shoreline Exhibit
- Communitywide Vulnerability Assessment Community and Stakeholder Engagement Workshops
