Fjernvarme Fyn - 2026 Major Overhaul FYV7
Contract award notice · Denmark · Last reported Feb 2026
Source: TED Europa
The main purpose with the major overhaul is to ensure that the unit is in a condition where it can be oper-ated safely, reliably and efficiently.
Today there are challenges with temperature differences between the lower casing and the upper casing.
Scope:
The “basic scope of supply” for the IP1 steam turbine major overhaul will include the following main activ-ities:
• Cutting of the inlet ste
- Status
- Closed
- Sector
- Wind, Manufacturing (Industrial)
- Location
- Odense C, Denmark
- Updated
- 3 Nov 2026
- Source
- TED Europa
ConstructChat
Ask ConstructChat about Fjernvarme Fyn - 2026 Major Overhaul FYV7
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | contract award notice |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The main purpose with the major overhaul is to ensure that the unit is in a condition where it can be oper-ated safely, reliably and efficiently. Today there are challenges with temperature differences between the lower casing and the upper casing. Scope: The “basic scope of supply” for the IP1 steam turbine major overhaul will include the following main activ-ities: • Cutting of the inlet steam pipe during disassembly and welding during assembly • Disassembly/opening of the steam turbine • Cleaning, blasting, NDT, fact finding, blue checks, measurements (before/after), etc. • Inspection and overhaul of 1 or more bearing(s) • Repairs of findings • Assembly and adjustments • Commissioning, tests and on-site balancing if needed |
Original sector | Industrial machinery, Construction work |
Budget |
Location
Country | Denmark |
City | Odense C |
Source
Source | TED Europa |
URL |
More Details
Record type | Tender |
Sector | Wind, Manufacturing (Industrial) |
Article published date | 2026-03-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Wind tenders in Denmark
- North Sea I, Mid, Offshore Wind Farm
- Tender for purchase, delivery and implementation of Ørsted Risk Management Platform
- Establishment of a stone bed at the Port of Rønne
- Headwear for the Danish Defence
- Supplier qualification system for Valve Supply Contracts concerning the Danish Hydrogen Backbone - 26/23313
- Major and minor overhauls of steam turbines and generators
- IT Consultancy Services for DTU Wind (RAM software)
- Strategy Consulting 2025
