Float Reconstruction – Port Clements
Source: Canada Buy and Sell
Background
Small Craft Harbours (SCH) Pacific Region requires the complete Replacement an existing timber float (Float 802) with a new 12’ wide timber float at the federal government owned harbour at Port Clements (Site) on Haida Gwaii Island, British Columbia.
Objective of this Work is to fabricate a new float, Removal and disposal of the old float, and the complete installation of the new
Tender Information FAQ
Tender Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | open |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Background Small Craft Harbours (SCH) Pacific Region requires the complete Replacement an existing timber float (Float 802) with a new 12’ wide timber float at the federal government owned harbour at Port Clements (Site) on Haida Gwaii Island, British Columbia. Objective of this Work is to fabricate a new float, Removal and disposal of the old float, and the complete installation of the new float with existing timber mooring pile in place. The existing timber mooring pile will not be replaced. Replacement: Removal of existing component including treated timber, hardware and fasteners and to be replaced with new component including supply and install of new hardware and treated timber, drilling, field fitting and field treating as required. Removal: Dismantling, demolition, handling, sorting, and hauling material away from Site. Owner Supply SCH will supply all timber material and hardware required for the complete float fabrication. Summary of Work The lump sum portion will be for the following: • Mobilization and Demobilization • New Timber Float Fabrication • Removal and Disposal of Existing float 802 • New Float Install Cost Plus portion will be for the following: • Float Utilities remove and re-install Site Specific Requirements: Work must be done to minimize the period on when float 802 is out of commission to minimize the time vessels are relocated due to this project. Contractor must pre-fabricate the new floats and ready to install in place before the removal of the existing float 802. Maximum time that float 802 can be out of commission is four (4) weeks. The contractor cannot first remove the old float so that is no float while the new float is being fabricated. Contractor to provide at least two (2) weeks notification on when they want the vessels to be relocated from float 802 TWO PHASE SELECTION PROCESS This is the first phase (Phase 1) of a two-phase competition: the first phase will evaluate the qualifications of all bidders; second phase (Phase 2) will invite the qualified bidders to provide a financial bid on the project based on the specifications and drawings. Upon award of contract in Phase Two the pre-qualification list will be terminated, no additional contracts will be awarded. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
