Fms Repair Oxygen System, Aircr
Sector: Manufacturing (Industrial) • Location: United States of America
Source: SAM.gov
N0038326PR0R380_FMS TRANSPORTATION SCHEDULE INSTRUCTIONS: In accordance with attached packaging sheet Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor’s facility as
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Aerospace & Defense, Government, Commercial, Residential
- Location
- United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Fms Repair Oxygen System, Aircr
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | solicitation |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | N0038326PR0R380_FMS TRANSPORTATION SCHEDULE INSTRUCTIONS: In accordance with attached packaging sheet Repair Turnaround Time (RTAT) definition: The contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract. For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor’s facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt. Required RTAT: 26 days after receipt of asset The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in the subsequent contract. Throughput Constraint: Contractor must provide a throughput Constraint for each NSN(s). Total assets to be repaired monthly after initial delivery commences X/month (contractor fill in #). A throughput of ##____ per month reflects no throughput constraint. Induction Expiration Date: 365 days after contract award date. Any asset received after this date in days is not authorized for repair without bi-lateral agreement between the Contractor and NAVSUP WSS Contracting Officer. Reconciliation: The parties have agreed to a price (shown on the schedule page) for each unit at the negotiated RTAT. Such prices are based on the Contractor meeting the RTAT requirements If the Contractor does not meet the applicable RTAT requirement, described within the schedule page, consideration will be assessed and subject to negotiation. Price reductions made pursuant to this section shall not limit other remedies available to the Government for failure to meet required RTATs, including but not limited to the Government's right to terminate for default. ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERS DELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, ORSENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred. POC: Kristin Clemens Phone: 771-229-0403 E-mail: kristin.clemens2.civ@us.navy.mil |
Original sector | Not Identified |
Location
Country | United States of America (USA) |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Manufacturing (Industrial), Aerospace & Defense, Government, Commercial, Residential |
Article published date | 2026-04-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Manufacturing (Industrial) tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Sole Source for a Hand Held Video Receiver System
- Security Hardware Services
- KilleenFort Hood Regional Airport KFHRA Terminal Apron Rehabilitation Phase II
- PreQualification of Bidders for Chaboya Improvements
- Alonzo Babe James Community Center Playground Artificial Turf
- Prefabricated Manufactured Structures as Living Quarters for County Fire Personnel
