Fort Buchanan Microgrid
Sector: Energy Storage • Location: San Juan, Puerto Rico, United States of America
Source: SAM.gov
This is a Design-Bid-Build Construction project to provide an installation-level microgrid at Fort Buchanan consisting of approximately 8 MW of new diesel generators and 4 MWh battery energy storage system (BESS), as an option. In addition, the project will install a microgrid control system including, but not limited to, paralleling switchgear, transformers, transfer switches, circuit breakers, p
- Status
- Prospective
- Sector
- Energy Storage, Power Generation (CCGT), Aerospace & Defense, Wind, Telecommunications, Commercial, Broadband, Manufacturing (Industrial), Solar, Residential, Power Transmission
- Location
- San Juan, Puerto Rico, United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Fort Buchanan Microgrid
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | solicitation |
Taiyo status | Prospective |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | This is a Design-Bid-Build Construction project to provide an installation-level microgrid at Fort Buchanan consisting of approximately 8 MW of new diesel generators and 4 MWh battery energy storage system (BESS), as an option. In addition, the project will install a microgrid control system including, but not limited to, paralleling switchgear, transformers, transfer switches, circuit breakers, protective relaying and fiber optic communication connections. The project will install twelve 12,000-gallon above-ground, ballistic-resistant, diesel fuel tanks with a fuel polishing system to sustain critical operations continuously for 14 days. The microgrid will include integration of existing large-scale onsite generation (4.65 MW from solar photovoltaic (PV) array and two 275 kW wind turbines). The project also includes site work, start-up commissioning, interconnection agreement, assessment & authorization and all associated costs. The microgrid system will support energy resiliency by providing on-site energy generation, this includes the installation of diesel generators, microgrid control system, electrical interconnection switchgear, interconnection circuit wirings, and modification to the existing electrical distribution system as necessary to establish the Fort Buchanan microgrid network. The net metering and interconnection agreements will require approval from the utility provider, LUMA. The Contract Duration is one thousand one hundred forty-one (1,141) calendar days from Notice to Proceed. TYPE OF CONTRACT AND NAICS: This RFP will be for one (1) Firm-Fixed-Price (FFP) contract. The North American Industrial Classification System Code (NAICS) for this effort is 237130. Size Limitation is $45,000,000.00 TYPE OF SET-ASIDE: This acquisition will be a General Small Business SET-ASIDE procurement. |
Original sector | Construction |
Location
Country | United States of America (USA) |
State | Puerto Rico |
City | San Juan |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Energy Storage, Power Generation (CCGT), Aerospace & Defense, Wind, Telecommunications, Commercial, Broadband, Manufacturing (Industrial), Solar, Residential, Power Transmission |
Article published date | 2026-05-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Energy Storage tenders in United States of America
- HOUSEHOLD SINGLEUSE RECHARGEABLE BATTERY COLLECTION AND RECYCLING SERVICES
- BATTERIES FOR SURVEILLANCE EQUIPMENT
- Southeast Water Pollution Control Plant Power Feed and Prima...
- Flashlights and Batteries
- IFB 970302022LW Flashlights and Accessories
- Power Utility Rate Consulting Services for 2021 Electric Rates Study
- RFP - Portable Mass Spectrometer Device
- Southeast Water Pollution Control Plant Power Feed and Prima...