Fort Chaffee Arkansas Fueling System Repairs
One of 5,966 tenders Taiyo tracks in Nebraska.
Source: Nebraska Purchasing Group
This project includes fuel system repairs at the Fort Chaffee retail and bulk fuel facilities . At the service station : Modify the three 8 , 000 gallon aboveground fuel storage tanks ( AST ? s ) and appurtenances ( including tank draining , cleaning , and disposal of any remaining product ); Remove and dispose of th
- Status
- Closed
- Sector
- Road, Aerospace & Defense, Water Supply and Storage, Metal, Steel, Car parking, Commercial, Cement, Automotive
- Location
- Nebraska, United States of America
- Updated
- 3 Nov 2026
- Source
- Nebraska Purchasing Group
ConstructChat
Ask ConstructChat about Fort Chaffee Arkansas Fueling System Repairs
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | This project includes fuel system repairs at the Fort Chaffee retail and bulk fuel facilities . At the service station : Modify the three 8 , 000 gallon aboveground fuel storage tanks ( AST ? s ) and appurtenances ( including tank draining , cleaning , and disposal of any remaining product ); Remove and dispose of three dispensers ; Install three 12 , 000 gallon AST ? s on new concrete pad ; Repair dispensers ( Two ( 2 ) diesel , One ( 1 ) MOGAS ) on new islands ; Install offload point ; Install parking hardstand area and spill containment system ; AST work includes shut off valves , strapping charts , and catwalks ; Install bollards ; Repair emergency shut off system ; Repair site lighting ; Replace equipment building ; Repair pavement . Construct a new steel framed canopy estimated to being 41 . 5 feet x 125 feet . Constructing new metal canopy construction and the associated foundation construction required . Foundation removal experience . At the bulk fuel facility : At the 3 AST ? s provide catwalk , high level shut off , mechanical level gauge , water draw off , and strapping charts ; Provide offload pumps , site flow indicator , offload meter Teflon pads , air eliminator , pressure relief valves , product recovery tanks , dispenser sumps ; Replace fillstand pump , fuel piping , filter separator , undersized piping , threaded piping and valves , and dispensers ; Install pipe supports ; Remove transfer piping ; Add level alarm ; Repair pipe supports ; Install bollards . All Contractors working at Fort Chaffee must be a licensed commercial contractor registered with the Contractors Licensing Board in Arkansas . Contractors will have experience installing brand new UL 2085 horizontal jet fuel ( F - 24 ) ASTs and installing meter proving connections . |
Location
Country | United States of America (USA) |
State | Nebraska |
Source
Source | Nebraska Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Road, Aerospace & Defense, Water Supply and Storage, Metal, Steel, Car parking, Commercial, Cement, Automotive |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- NEW TIRES RETREADS AND TIRE SERVICES
- Professional Construction Engineering and Inspection CEI Services for the Williamson Boulevard Widening
- Lincoln Avenue Wascher to Killarney Preliminary Engineering Section 220065800PV
- KilleenFort Hood Regional Airport KFHRA Terminal Apron Rehabilitation Phase II
- IFB 947902022JM Screening 10 Asphalt Filter Stone 8 Granite Double Washed
- IFB 914202022AM Street Sweeper Parts and Brooms
- IFB 843402021AB Hay Alfalfa and Wheat Straw for Norfolk Zoo
