Fort Gibson Powerhouse Roof Replacement, Oklahoma
Sector: Aerospace & Defense • Location: Ft Gibson, Oklahoma
Source: SAM.gov
This project will be a turnkey Design-Build (D-B) contract with all design and construction work being performed by the Contractor. The Contractor will provide all investigation, verification of site conditions and dimensions, design, research, travel, plant, materials, equipment, labor, instruments, tools, subcontractors, supervision, and management to complete all work required by these contract
- Status
- Closed
- Sector
- Aerospace & Defense, Residential, Waste Processing and Treatment, Commercial
- Location
- United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Fort Gibson Powerhouse Roof Replacement, Oklahoma
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | sources sought |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | This project will be a turnkey Design-Build (D-B) contract with all design and construction work being performed by the Contractor. The Contractor will provide all investigation, verification of site conditions and dimensions, design, research, travel, plant, materials, equipment, labor, instruments, tools, subcontractors, supervision, and management to complete all work required by these contract documents. The work in this contract shall include design and construction of a new 2-ply Modified Bituminous Membrane roof system to replace the existing Built-up roof assembly on the Ft. Gibson Powerhouse Roof, new roof drainage, as well as options for new guard rails and new roof ladders. |
Original sector | Construction |
Location
Country | United States of America (USA) |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Aerospace & Defense, Residential, Waste Processing and Treatment, Commercial |
Article published date | 2025-12-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
