Fountain Repair
Sector: Water Supply and Storage • Location: Maryland, United States of America
Source: Maryland Purchasing Group
Fountain Lighting System ● Provide power for the new lighting system from an existing outlet located adjacent to the fountain basin . ● Run new electrical wiring under the brick surface , enclosed in conduit for protection , from the outlet to a new outlet installed next to the fountain basin . ● Core drill
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT)
- Location
- Maryland, United States of America
- Updated
- 3 Nov 2026
- Source
- Maryland Purchasing Group
ConstructChat
Ask ConstructChat about Fountain Repair
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Fountain Lighting System ● Provide power for the new lighting system from an existing outlet located adjacent to the fountain basin . ● Run new electrical wiring under the brick surface , enclosed in conduit for protection , from the outlet to a new outlet installed next to the fountain basin . ● Core drill through the fountain basin wall to allow wiring to pass through to the interior of the basin . ● Install five ( 5 ) new underwater LED lights positioned beneath each fountain nozzle . ● Connect all new lighting to a transformer located beside the new outlet , programmed to control operating times for the lights . Fountain Basin Sealing ● Pump out and remove all water from the fountain basin . ● Protect surrounding surfaces by taping off tiles , fountain nozzles , and other areas that do not require sealant application . ● Sand the entire basin surface to ensure proper adhesion of the new sealer . ● Apply three ( 3 ) coats of professional - grade sealer , allowing 24 hours of curing time per coat . ● Seal all visible cracks in the tile with waterproof silicone to prevent water intrusion . ● Clean and repaint the exterior of the fountain basin . Auto Fill Install ● Remove and dispose of the existing non - functional autofill unit located in the fountain basin . ● Supply and install a new Pentair IntelliLevel 523265 electronic autofill system ( or equivalent ) in the fountain basin . ● Install the new control box in the pump room and integrate it with the existing solenoid to provide automated water level control . ● Provide warranty information for all workmanship and installed components . |
Location
Country | United States of America (USA) |
State | Maryland |
Source
Source | Maryland Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Power Generation (CCGT) |
Article published date | 2026-05-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Water Supply and Storage tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Security Hardware Services
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Se Dixie Highway County Road A1A Utility Relocation Project
- UNPAINTED SNOW FENCE AND DUNE GRASS NO II
- PreQualification of Bidders for Chaboya Improvements
