Fox Memorial Bridge Reconstruction
Sector: Cement • Location: North Dakota, United States of America
Source: North Dakota Purchasing Group
The work is a single prime lump sum bid contract highlighted by the following : 1 . Work in and around known and delineated wetlands , with work limits and related shown on the plans ; all permitting work related to the wetlands are being obtained by the Owner . 2 . Site erosion control and removal of
- Status
- Closed
- Sector
- Cement, Metal, Education, Steel, Rail, Bridge, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- North Dakota, United States of America
- Updated
- 3 Nov 2026
- Source
- North Dakota Purchasing Group
ConstructChat
Ask ConstructChat about Fox Memorial Bridge Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The work is a single prime lump sum bid contract highlighted by the following : 1 . Work in and around known and delineated wetlands , with work limits and related shown on the plans ; all permitting work related to the wetlands are being obtained by the Owner . 2 . Site erosion control and removal of the existing 73 ’ x8 ’ precast concrete topped double tee pedestrian bridge and partial demolition of reinforced concrete abutments . 3 . Delegated design , fabrication , and delivery of a prefabricated weathering steel half - through bowstring style pedestrian bridge with a 110 ’ span and a 10 ’ wide concrete deck designed to AASHTO pedestrian bridge requirements ; designed , fabricated , and delivered in accordance with specification 34 8100 . 4 . Helical round shaft pile supported reinforced concrete abutments with delegated design of the helical piles in accordance with project specification 31 6615 . 5 . Field installation of the bridge , and bridge deck and termination plates at each end . 6 . Demolition and reconstruction of site sidewalks , site decorative pavers , and grass surfaces . 7 . Removal and relocation of existing pedestrian lights , removal and reuse of existing pedestrian lighting heads and luminaries that are field installed to the top chord of the bridge , provision of new pedestrian lights , and related underground electrical power circuits . 8 . An Alternate Bid to provide decorative LED lights to the top chord and mid - rail portion of each side of the bridge , including metal fabrication field - attached to the prefabricated bridge that house the LED lights , ( 2 ) exterior pad - mounted cabinets to house the LED light control modules , power and control underground circuits that connect to the existing Hopper Danley Spiritual Center , and related electrical work |
Location
Country | United States of America (USA) |
State | North Dakota |
Source
Source | North Dakota Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Cement, Metal, Education, Steel, Rail, Bridge, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2026-04-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Cement tenders in United States of America
- RFP - Thurston County Lake Management Districts Submerged Aquatic Vegetation Control
- Horsehaven Creek Culvert Replacement Project D230
- 23B49SR Marine Science Center Turtle Canopy
- Se Dixie Highway County Road A1A Utility Relocation Project
- PreQualification of Bidders for Chaboya Improvements
- 2022 Concrete Repairs Jackson Manor Subdivision
- SAC Building 10318 Exterior Paint
- Fire Station 32 ADA Restroom Improvements
