Framework Agreement on Electrotechnical Consultancy Services
Sector: Energy Storage • Location: Denmark
Source: TED Europa
This Framework Agreement comprises technical advice and consultancy services to BeGreen in relation to development, installation and operation and maintenance of (combined or individual) Renewable Energy Plants (“REP”, solar PV or wind) and Battery Energy Storage System (“BESS”) facilities within the area of Grid Connection Compliance Studies.
The framework agreement may also be used for other en
- Status
- Closed
- Sector
- Energy Storage, Power Generation (CCGT), Wind, Solar, Power Transmission
- Location
- Denmark
- Updated
- 3 Nov 2026
- Source
- TED Europa
ConstructChat
Ask ConstructChat about Framework Agreement on Electrotechnical Consultancy Services
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | contract award notice |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | This Framework Agreement comprises technical advice and consultancy services to BeGreen in relation to development, installation and operation and maintenance of (combined or individual) Renewable Energy Plants (“REP”, solar PV or wind) and Battery Energy Storage System (“BESS”) facilities within the area of Grid Connection Compliance Studies. The framework agreement may also be used for other energy projects for BeGreen within the specified services. BeGreen plans to develop and operate multiple utility-scale combined or stand-alone REP and BESS over the next years. The task is to perform the steps necessary to obtain grid connection approval by the DSO/TSO under the current regulation and as described above, as well as to provide all necessary technical support, attend meetings with stakeholders, and prepare documentation to obtain the different operational notifications (EON, ION and FON) at plant level. Services included in the Framework Agreement includes amongst others: • Technical Regulation 3.2.7: Requirements for voltage quality for generation facility connections to the transmission grid • NC RfG - National requirements • Appendix A - Information exchange • Appendix B - Simulation models • Technical Regulation 3.3.1 Requirements for energy storage facilities • Technical Regulation 3.1.1 – Requirements for co-located and/or overplanted facilities connected to the transmission grid. For further details on the tasks covered by this tender, please refer to Appendix 2 (Service Description). |
Original sector | Architectural, construction, engineering and inspection services, Architectural, construction, engineering and inspection services, Architectural, construction, engineering and inspection services, Architectural, construction, engineering and inspection services, Architectural, construction, engineering and inspection services, Architectural, construction, engineering and inspection services, Architectural, construction, engineering and inspection services, Architectural, construction, engineering and inspection services, Architectural, construction, engineering and inspection services, Architectural, construction, engineering and inspection services, Architectural, construction, engineering and inspection services |
Budget |
Location
Country | Denmark |
Source
Source | TED Europa |
URL |
More Details
Record type | Tender |
Sector | Energy Storage, Power Generation (CCGT), Wind, Solar, Power Transmission |
Article published date | 2026-06-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Energy Storage tenders in Denmark
- AVV Square 2.0 - BESS MV Switchgear
- Power Amplifier - PAMP
- Electrical installations required for connection of Battery Energy Storage System (BESS)
- 02.03 Servere og storage (DIS)
- Open procedure for more Trains to Aarhus Letbane
- EU-tender regarding Battery Energy Storage System (BESS) for Verdo Produktion 2026
- Framework agreement for the supply of stationary OPzS batteries
- Rammeaftale på Plan-, Miljø- og Naturforhold
