Framework for the Repair and Maintenance of Public Rights of Way
The scope, dates and status of this tender. A free account opens every field.
Source: Open Contracting Data Standard (OCDS)
Wrexham County Borough Council (WCBC) is looking to establish a framework agreement to carry out maintenance work on Public Rights of Way. It is anticipated that no more than three contractors will be appointed to the framework to carry out the contracted work. There are approximately 1,500 public rights of way within the County Borough which amounts to 850km. The Public Rights of Way section inst
- Status
- Closed
- Location
- United Kingdom
- Updated
- 3 Nov 2026
- Source
- Open Contracting Data Standard (OCDS)
ConstructChat
Ask ConstructChat about Framework for the Repair and Maintenance of Public Rights of Way
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | cancelled |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Wrexham County Borough Council (WCBC) is looking to establish a framework agreement to carry out maintenance work on Public Rights of Way. It is anticipated that no more than three contractors will be appointed to the framework to carry out the contracted work. There are approximately 1,500 public rights of way within the County Borough which amounts to 850km. The Public Rights of Way section installs approximately 150 galvanised pedestrian gates, 100 stiles and 150 signposts annually. In addition to this, ditch crossings and small footbridges are installed together with the installation of handrails and steps and path clearance work. In addition to the general maintenance work which can include some strimming, 145,005 metres of strimming is carried out across the County Borough in May, July and late August averaging approximately 48,335 metres of strimming per month. Contractors have the option of whether they wish to tender for this work and need to be aware that some of the paths are located in rural areas where vehicular access is not always possible. Contractors can be expected to walk up to 5 or 10 minutes to reach part of a path that requires strimming. In November of each year approximately 25 paths will also need to be cleared of leaf litter. |
Location
Country | United Kingdom (UK) |
Source
Source | Open Contracting Data Standard (OCDS) |
URL |
More Details
Record type | Tender |
Article published date | 2026-04-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More infrastructure tenders in United Kingdom
- Submarine HV cable rock protection
- Submarine HV cable rock protection
- 2024-01-05 09:00 - QBE129 Haverhill to Riverwalk School, Bury St Edmunds
- Usługa kompleksowej organizacji udziału przedsiębiorstw z województwa łódzkiego w charakterze wystawców na targach branży spożywczej IFE 2026
- Tender for Play Area Works within the Borough of Ards and North Down
- SUMIT Project Hardware and Connectivity Services
- Laboratory Consumables and Chemicals
- OSPAR Relational Database for the implementation of Recommendations on the List of threatened and/or declining habitats and species
