Freezer / Cooler - IMS
Sector: Metal • Location: West Virginia, United States of America
Source: West Virginia Purchasing Group
CONTRACTOR RESPONSIBILITY 1 . Remove existing walk - in freezer , cooler panels , refrigeration units , and other old units . Coordinate with the Raleigh Maintenance Director regarding roof units that may be salvaged for future use . 2 . Deliver , uncrate , and furnish all materials , equipment , and labor to erect new wa
- Status
- Closed
- Sector
- Metal, Commercial
- Location
- West Virginia, United States of America
- Updated
- 3 Nov 2026
- Source
- West Virginia Purchasing Group
ConstructChat
Ask ConstructChat about Freezer / Cooler - IMS
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | CONTRACTOR RESPONSIBILITY 1 . Remove existing walk - in freezer , cooler panels , refrigeration units , and other old units . Coordinate with the Raleigh Maintenance Director regarding roof units that may be salvaged for future use . 2 . Deliver , uncrate , and furnish all materials , equipment , and labor to erect new walk - in 3 . freezer and cooler panels as per specifications - install piping , gas charge , start - up , and checkout of all systems after all final connections are made . Install condensate drain lines from evaporator coils to the existing floor drain . 4 . Make final electrical connections to existing utilities . 5 . Install and set up all walk - in storage shelves . 6 . Set condensing units in the area designated by the Owner . 7 . Provide for the recovery and disposal of refrigerant . 8 . Install evaporator coils . 9 . Coordinate with the Owner on opening and closing of the building during installation . 10 . Dispose of the old walk - in freezer , cooler , and other equipment . 11 . Ensure the evaporator condensate drain is copper tubing with insulated heat tape in the freezer unit . 12 . Ensure all lines are copper and joints brazed – no quick disconnects . 13 . Seal all penetrations to prevent air leaks . 14 . Seal the seams of the box outside to prevent leakage . 15 . Silicone all interior seams before starting up the refrigeration unit . 16 . Coordinate with the Raleigh County Maintenance Director regarding the locations of electrical breaker box panels and the number of needed circuits . 17 . Install all wiring and conduits from the breaker box panel to the indoor and outdoor units . An electrical receptacle will need to be installed near or around the outside unit . Disconnects are to be installed near the outdoor units . Coordinate with the Raleigh County Maintenance Director regarding the electrical and plumbing requirements for a complete freezer , cooler , and oven installation . 18 . Make and confirm all field measurements . |
Location
Country | United States of America (USA) |
State | West Virginia |
Source
Source | West Virginia Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Metal, Commercial |
Article published date | 2026-05-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
