Fremantle Hospital W Block Domestic hot water copper pipe replacement
Sector: Water Supply and Storage • Location: Australia
Restricted to members of the HSS304918 Panel arrangement only The intent of this project is to replace the hot water ring main loop and branch pipes including the installation of isolation valves within W Block at Fremantle hospital. Removal of old decommissioned ring main loop and non-compliant dead legs.
- Status
- Closed
- Sector
- Water Supply and Storage, Hospital, Metal, Residential, Commercial
- Location
- Australia
- Updated
- 3 Nov 2026
- Source
- western_australia
ConstructChat
Ask ConstructChat about Fremantle Hospital W Block Domestic hot water copper pipe replacement
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Restricted to members of the HSS304918 Panel arrangement only The intent of this project is to replace the hot water ring main loop and branch pipes including the installation of isolation valves within W Block at Fremantle hospital. Removal of old decommissioned ring main loop and non-compliant dead legs. |
Original sector | Plumbing system maintenance or repair |
Budget |
Location
Country | Australia |
Source
Source | western_australia |
URL |
More Details
Record type | Tender |
Sector | Water Supply and Storage, Hospital, Metal, Residential, Commercial |
Article published date | 2026-10-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
