Ftg247 Replace Ups At Idt1
Sector: Residential • Location: Fort Greely, Alaska
Source: SAM.gov
THE PURPOSE OF THIS PROJECT IS TO REPLACE THE EXISTING 80KVA UNINTERRUPTABLE POWER SYSTEMS (UPSS) WITH DISTRIBUTED REDUNDANT 75 KILOVOLT-AMPERE (KVA) UPSS. NEW UPS PANELBOARDS WILL BE ADDED TO ALLOW FOR REDUNDANT RECEPTACLES FOR ALL THE MISSION EQUIPMENT WITHIN THE HIGH-ALTITUDE ELECTROMAGNETIC PULSE (HEMP)-SHIELDED EQUIPMENT ROOM. EMERGENCY POWER OFF (EPO) WILL BE UPGRADED TO THE LATEST MDA GMD S
- Status
- Closed
- Sector
- Residential, Power Generation (CCGT), Aerospace & Defense, Commercial
- Location
- United States of America
- Updated
- 3 Nov 2026
- Source
- SAM.gov
ConstructChat
Ask ConstructChat about Ftg247 Replace Ups At Idt1
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | THE PURPOSE OF THIS PROJECT IS TO REPLACE THE EXISTING 80KVA UNINTERRUPTABLE POWER SYSTEMS (UPSS) WITH DISTRIBUTED REDUNDANT 75 KILOVOLT-AMPERE (KVA) UPSS. NEW UPS PANELBOARDS WILL BE ADDED TO ALLOW FOR REDUNDANT RECEPTACLES FOR ALL THE MISSION EQUIPMENT WITHIN THE HIGH-ALTITUDE ELECTROMAGNETIC PULSE (HEMP)-SHIELDED EQUIPMENT ROOM. EMERGENCY POWER OFF (EPO) WILL BE UPGRADED TO THE LATEST MDA GMD STANDARDS. POWER CONTROL AND MONITORING SYSTEM (PCMS) AND POWER QUALITY MONITORING SYSTEM (PQMS) WILL ALSO BE EXTENDED INTO IDT1 FROM THE FORT GREELY POWER PLANT (FPP).TO RECEIVE A COPY OF THE SOLICITATION AND AMENDMENTS PLEASE EMAIL BRITTNEY MORRISON AT BRITTNEY.MORRISON@USACE.ARMY.MIL AND MICHELLE NELSEN AT MICHELLE.NELSEN@USACE.ARMY.MIL |
Original sector | Construction |
Location
Country | United States of America (USA) |
Source
Source | SAM.gov |
URL |
More Details
Record type | Tender |
Sector | Residential, Power Generation (CCGT), Aerospace & Defense, Commercial |
Article published date | 2025-11-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
