Fuel Tank Replacements ( Rebid )
Bids closed Apr 2026 · Tennessee · Last reported Mar 2026
Source: Tennessee Purchasing Group
The selected vendor shall provide all labor , materials , and equipment required for a turn - key solution involving the decommissioning of existing equipment . The following demolition and removal tasks are required : Tank Removal : Complete removal and off - site disposal of two ( 2 ) existing tanks , including all r
- Status
- Closed
- Sector
- Wind, Power Generation (CCGT), Cement
- Location
- Tennessee, United States of America
- Updated
- 3 Nov 2026
- Source
- Tennessee Purchasing Group
ConstructChat
Ask ConstructChat about Fuel Tank Replacements ( Rebid )
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | The selected vendor shall provide all labor , materials , and equipment required for a turn - key solution involving the decommissioning of existing equipment . The following demolition and removal tasks are required : Tank Removal : Complete removal and off - site disposal of two ( 2 ) existing tanks , including all residual fuel , sludge , and contaminated rinsing fluids . Containment Area : Complete removal and off - site disposal of existing liquid , including all residual fuel , sludge , and fluids . Containment Wall Removal : Remove the 34 ’ x 5 ’ 2 ” concrete wall of the containment area facing the pumps . Concrete Pad Removal ( Pump Area ): Remove the 18 ’ x 30 ’ ( 540 SF ) concrete pad surrounding the pumps . Concrete Pad Removal ( Intermediate ): Remove the 34 ’ x 8 ’ ( 272 SF ) concrete pad located between the pump pad and the containment wall . Island Removal : Remove the existing 12 ’ x 4 ’ ( 48 SF ) concrete island pad . II . Tank Installation and Specifications The project requires the furnishing and installation of one ( 1 ) 6 , 000 - gallon and one ( 1 ) 10 , 000 - gallon cylindrical aboveground horizontal tank designed for gasoline and diesel fuel . All options must fit within the existing containment areas of 11 . 5 ’ x 22 ’ and 21 . 5 ’ x 22 ’. Option # 1 : UL 2085 Fireguard Tank Standard : Furnish and install Fireguard horizontal tanks or approved equal . Interior Finish : Each tank interior will be painted with an epoxy liner . Exterior Finish : Each exterior will be painted with an epoxy primer and white urethane . Warranty : The tanks must come with a 30 - year warranty . Option # 2 : UL 142 Double Wall Tank Standard : Furnish and install UL 142 double - wall horizontal tanks . Exterior Finish : Each tank exterior will be painted with an epoxy primer and white urethane . Warranty : Provide a standard tank warranty . Required Components for All Tank Options The following components must be furnished and installed on each of the tanks specified above : Venting : Primary and emergency vents . Monitoring : Morrison Brothers ( or approved equal ) liquid level clock gauges . Protection : Morrison Brothers ( or approved equal ) overfill protection valves . Fill System : Grade - level fill piping complete with a 20 - gallon Spill Mate overspill container . Hardware : 1 - way swing check valves , ball valves , male adapters , and dust caps . Identification : Required product identification and warning decals . III . Electrical , Piping , and Site Improvements The vendor must provide pricing for each of the following infrastructure configurations as directed . Option # 1 : Underground Infrastructure Electrical Replacement : Replace all electrical wiring , conduit , switches , and the breaker panel associated with the tank installation and routed to the fuel pump and card reader location . Emergency Power : Includes a manual transfer switch and portable generator tap box . Piping Replacement : Replace all piping , fittings , and valves associated with the tank installation and routed to the fuel pump and card reader location . Option # 2 : Selective Replacement Electrical Installation : Install only needed electrical wiring , conduit , and switches associated with the tank installation and pump / card reader location . System Testing : Test and replace only failing existing electrical components and piping / valves . Emergency Power : Includes a manual transfer switch and portable generator tap box . Option # 3 : Above Ground Infrastructure Structural Support : Install a structural support system from the AST area to the fuel island that fits under the existing canopy . Compliance : The structure must meet all codes for load , seismic , and wind ratings . |
Location
Country | United States of America (USA) |
State | Tennessee |
Source
Source | Tennessee Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Wind, Power Generation (CCGT), Cement |
Article published date | 2026-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Wind tenders in United States of America
- Winter Shelter Site Request for Information
- CANCELLED - Alameda Creek Recapture - Barge System Supplier ... Cost:
- North Sphere Wind Fence Installation Project
- Invitation For Bid IFB Guadalupe Memorial Garden
- Request for Qualifications Weather Response for Persons Experiencing Homelessness
- Fuel Tank Inspection and Repair Services
- Quote 20Q1 Repair Services for Musical Instruments
- 525 Golden Gate Avenue Tower Access and Fall Protection
