logo

Fuel Tank Replacements ( Rebid )

Bids closed Apr 2026 · Tennessee · Last reported Mar 2026

Source: Tennessee Purchasing Group

Tender
Closed

The selected vendor shall provide all labor , materials , and equipment required for a turn - key solution involving the decommissioning of existing equipment . The following demolition and removal tasks are required :  Tank Removal : Complete removal and off - site disposal of two ( 2 ) existing tanks , including all r

Status
Closed
Sector
Wind, Power Generation (CCGT), Cement
Location
Tennessee, United States of America
Updated
3 Nov 2026
Source
Tennessee Purchasing Group

ConstructChat

Ask ConstructChat about Fuel Tank Replacements ( Rebid )

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Tender Information FAQ

Tender Information

3 Q
The tender “Fuel Tank Replacements ( Rebid )” is a tender record in Taiyo, linked to the Wind sector. It is issued for works, goods, or services related to Tennessee, United States of America.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-11-03

Contact

Not available for this record.

Description

Description

The selected vendor shall provide all labor , materials , and equipment required for a turn - key solution involving the decommissioning of existing equipment . The following demolition and removal tasks are required :  Tank Removal : Complete removal and off - site disposal of two ( 2 ) existing tanks , including all residual fuel , sludge , and contaminated rinsing fluids .  Containment Area : Complete removal and off - site disposal of existing liquid , including all residual fuel , sludge , and fluids .  Containment Wall Removal : Remove the 34 ’ x 5 ’ 2 ” concrete wall of the containment area facing the pumps .  Concrete Pad Removal ( Pump Area ): Remove the 18 ’ x 30 ’ ( 540 SF ) concrete pad surrounding the pumps .  Concrete Pad Removal ( Intermediate ): Remove the 34 ’ x 8 ’ ( 272 SF ) concrete pad located between the pump pad and the containment wall .  Island Removal : Remove the existing 12 ’ x 4 ’ ( 48 SF ) concrete island pad . II . Tank Installation and Specifications The project requires the furnishing and installation of one ( 1 ) 6 , 000 - gallon and one ( 1 ) 10 , 000 - gallon cylindrical aboveground horizontal tank designed for gasoline and diesel fuel . All options must fit within the existing containment areas of 11 . 5 ’ x 22 ’ and 21 . 5 ’ x 22 ’. Option # 1 : UL 2085 Fireguard  Tank Standard : Furnish and install Fireguard horizontal tanks or approved equal .  Interior Finish : Each tank interior will be painted with an epoxy liner .  Exterior Finish : Each exterior will be painted with an epoxy primer and white urethane .  Warranty : The tanks must come with a 30 - year warranty . Option # 2 : UL 142 Double Wall  Tank Standard : Furnish and install UL 142 double - wall horizontal tanks .  Exterior Finish : Each tank exterior will be painted with an epoxy primer and white urethane .  Warranty : Provide a standard tank warranty . Required Components for All Tank Options The following components must be furnished and installed on each of the tanks specified above :  Venting : Primary and emergency vents .  Monitoring : Morrison Brothers ( or approved equal ) liquid level clock gauges .  Protection : Morrison Brothers ( or approved equal ) overfill protection valves .  Fill System : Grade - level fill piping complete with a 20 - gallon Spill Mate overspill container .  Hardware : 1 - way swing check valves , ball valves , male adapters , and dust caps .  Identification : Required product identification and warning decals . III . Electrical , Piping , and Site Improvements The vendor must provide pricing for each of the following infrastructure configurations as directed . Option # 1 : Underground Infrastructure  Electrical Replacement : Replace all electrical wiring , conduit , switches , and the breaker panel associated with the tank installation and routed to the fuel pump and card reader location .  Emergency Power : Includes a manual transfer switch and portable generator tap box .  Piping Replacement : Replace all piping , fittings , and valves associated with the tank installation and routed to the fuel pump and card reader location . Option # 2 : Selective Replacement  Electrical Installation : Install only needed electrical wiring , conduit , and switches associated with the tank installation and pump / card reader location .  System Testing : Test and replace only failing existing electrical components and piping / valves .  Emergency Power : Includes a manual transfer switch and portable generator tap box . Option # 3 : Above Ground Infrastructure  Structural Support : Install a structural support system from the AST area to the fuel island that fits under the existing canopy .  Compliance : The structure must meet all codes for load , seismic , and wind ratings .

Location

Country

United States of America (USA)

State

Tennessee

Source

Source

Tennessee Purchasing Group

URL

More Details

Record type

Tender

Sector

Wind, Power Generation (CCGT), Cement

Article published date

2026-05-05

More on this tender

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this tender
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this tender