Full Depth Reclamation and Paving
Closed · Georgia · Last reported Mar 2026
Source: Georgia Purchasing Group
Full Depth Reclamation : Full depth reclamation includes constructing a stabilized base course by pulverizing the existing pavement structure and mixing with Portland cement or other acceptable additive to the required depth . All work shall be performed in accordance with the current Georgia DOT standards for
- Status
- Closed
- Sector
- Road, Cement
- Location
- Georgia, United States of America
- Updated
- 3 Nov 2026
- Source
- Georgia Purchasing Group
ConstructChat
Ask ConstructChat about Full Depth Reclamation and Paving
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Full Depth Reclamation : Full depth reclamation includes constructing a stabilized base course by pulverizing the existing pavement structure and mixing with Portland cement or other acceptable additive to the required depth . All work shall be performed in accordance with the current Georgia DOT standards for construction for cement stabilized reclaimed base construction . Grade the reclaimed base between existing concrete gutters to accommodate a new asphalt pavement with standard crown at 2 %, sloping to either side , as the typical section , as follows : 10 in depth reclaimed base , 2 in 19 MM binder , 1 . 5 in 9 . 5 MM topping . The reclaimed base , binder and the topping shall be placed flush with existing gutters , where existing or newly constructed with the LINC project , however , an allowance of + 0 . 5 inch above the existing gutter is allowed for improved ride - ability . The Contractor shall be responsible for retaining a Georgia DOT approved testing firm to test the existing material and prepare a specific mix design for each road , or segment as may be necessary . The cost for this shall be included in the price bid for other items . Quality Control / Quality Assurance ( QC / QA ) shall be performed by the Contractor in cooperation with a Georgia DOT approved testing firm . Sampling , testing , and compaction shall be provided by the Contractor and shall be done in accordance with the Georgia DOT specifications . No separate payment shall be made for QC / QA , sampling , testing or the mix design . The City desires to recycle and reuse the existing asphalt in place by incorporating this asphalt into the stabilized base of the reclaimed section . Variable depth milling is included as a pay item in anticipation there is excess material . Any excess material shall become the property of the Contractor . The Contractor will not be permitted to grade excess material to exceed a 2 % cross slope . No separate item is provided for hauling . |
Location
Country | United States of America (USA) |
State | Georgia |
Source
Source | Georgia Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Road, Cement |
Article published date | 2026-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Road tenders in United States of America
- RFP - Pro-Tem Hearing Examiner
- NEW TIRES RETREADS AND TIRE SERVICES
- Professional Construction Engineering and Inspection CEI Services for the Williamson Boulevard Widening
- Lincoln Avenue Wascher to Killarney Preliminary Engineering Section 220065800PV
- KilleenFort Hood Regional Airport KFHRA Terminal Apron Rehabilitation Phase II
- IFB 947902022JM Screening 10 Asphalt Filter Stone 8 Granite Double Washed
- IFB 914202022AM Street Sweeper Parts and Brooms
- IFB 843402021AB Hay Alfalfa and Wheat Straw for Norfolk Zoo
