Fulton Rd Sewer Main Improvements West 3rd St to Santa Rosa Creek
Sector: Waste Processing and Treatment • Location: California, United States of America
Source: California Purchasing Group
Replace approximately 650 feet of failing sewer pipe that was installed under Santa Rosa Creek west of the Fulton Road Bridge in 1969 . The sewer was originally constructed using 18 - inch diameter asbestos cement pipe ( ACP ) to serve a significant geographical area . However , due to construction of other ne
- Status
- Closed
- Sector
- Waste Processing and Treatment, Bridge, Water Supply and Storage, Road
- Location
- California, United States of America
- Updated
- 3 Nov 2026
- Source
- California Purchasing Group
ConstructChat
Ask ConstructChat about Fulton Rd Sewer Main Improvements West 3rd St to Santa Rosa Creek
Pick a question to edit it, or write your own.
First answer free · no account
Tender Information FAQ
Tender Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-11-03 |
Contact
| Not available for this record. |
Description
Description | Replace approximately 650 feet of failing sewer pipe that was installed under Santa Rosa Creek west of the Fulton Road Bridge in 1969 . The sewer was originally constructed using 18 - inch diameter asbestos cement pipe ( ACP ) to serve a significant geographical area . However , due to construction of other nearby regional collection facilities , it now serves a relatively small area of only approximately 60 homes located in the Countryside subdivision southwest of Fulton Road and Santa Rosa Creek . The sewer has become partially obstructed and needs to be replaced . The project would include use of open trench construction methods to construct a replacement 8 - inch diameter gravity flow sewer under Santa Rosa Creek . |
Location
Country | United States of America (USA) |
State | California |
Source
Source | California Purchasing Group |
URL |
More Details
Record type | Tender |
Sector | Waste Processing and Treatment, Bridge, Water Supply and Storage, Road |
Article published date | 2026-05-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this tender
- News and media coverage
- Technical research
Free account · no card · lands you back on this tender
More Waste Processing and Treatment tenders in United States of America
- Coatings for Wet Well and Manholes
- Sole Source for Wedeco UV BulbsBallets
- Chambers Creek Regional Wastewater Treatment Plant BNR Aeration Basin Airflow Meters
- Annual Construction Contract For Utility Replacement 2022A
- FY23 Sewer Rehabilitation
- Fire Station 32 ADA Restroom Improvements
- Foothills Trail East Puyallup McMillin Trailhead Improvements
- Pipeline Trail Phase 1 Project
